How do you add topography in Revit?
In Revit, link the topography to the current model as follows:
- Specify coordinates for the building model. …
- Open a plan view or a 3D view for the building model. …
- Click Insert tab Link panel (Link Topography).
- In the Link Topography dialog, navigate to the topography. …
- Select the desired topography, and click Link.
How do you add topography to CAD in Revit?
Create a 3D Toposurface from the inserted DWG file:
- Click the Toposurface tool on the Site tab of the Design bar.
- On the Design bar, click Use Imported > Import Instance.
- Select the DWG file.
- Select the layers to add points from.
- Click OK.
- Click Finish Surface.
How do you get contour lines in Revit?
Contour labels display in site plan views.
- Create a topographic surface with different elevations.
- Open a site plan view.
- Click Massing & Site tab Modify Site panel (Label Contours).
- Sketch a line that intersects one or more contour lines.
Where are Revit site settings?
To access the Site Settings dialog, click the dialog launcher on the Model Sight panel. In the Site Settings dialog, you can modify the contour line display by adding contours. To do this, click Insert. Change the Start, Stop, and Increments values and select the desired Range Type and Subcategory.
How do you add thickness to topography in Revit?
To create the thickness you either create a copy of the 3D view or work in the default 3D view. 2. You then switch on the section box in view properties dialog. slightly into your 3D surface until you see you Topography Cut pattern appears.
How do you extrude a CAD file in Revit?
In Massing and Site > In Place Mass> call it with the name of the layer….from : Draw > Pick Lines. Hover the mouse over one of the shapes and TAB till the entire contour is highlighted. Then click on it > Form>Create Form > Solid Form > make extrusion….continue editing till you finish the shape from the layer….
How do you cut topography in Revit?
Split a Toposurface
- Open a site plan or 3D view.
- Click Site tab Modify Site panel (Split Surface).
- In the drawing area, select the toposurface to split. …
- Click Modify | Split Surface tab Draw panel (Pick Lines), or use other sketch tools to split the toposurface.
What is building pad in Revit?
You add a building pad by sketching a closed loop on a toposurface. After sketching the pad, you can specify a value to control the height offset from the level and other properties. … You then sketch a pad on the surface at an offset of –20 meters from the surface.
What is Toposurface in Revit?
The Toposurface tool defines a topographical surface (a toposurface) using points or imported data. You can create toposurfaces in 3D views or site plans. Create a Toposurface by Placing Points. Create a toposurface by placing points in the drawing area.
How do you hide topographic lines in Revit?
To turn off the lines:
- Go to Visibility Graphics > Contour Lines.
- Uncheck Primary Contours and Secondary Contours.
How do you change topography in Revit?
To view or change toposurface or subregion properties, open a 3D view or a site plan view, and then click Massing & Site tab Model Site panel (Toposurface). Select the surface material from the list. You can create your own toposurface material. Topographical surfaces do not support materials with surface patterns.
What is the standard interval between contour lines on a map?
The elevation difference or vertical distance between two adjacent contour lines would be 20 meters (100 : 5 = 20). Therefore the contour interval is 20 meters.