Open a panel schedule. Select a circuit. Click Modify Panel Schedule tab Circuits panel, and select one of the Move commands: Move Up, Move Down, Move Across, or Move To. The Move Across command moves the circuit to the same row on the opposite side of the panel.

How do I move a project schedule in Revit?

Solution:

  1. Open both projects in the same window of Revit.
  2. In the first project, right click on the name of the schedule you want to copy, and choose “Copy to Clipboard”
  3. In the target project, use the Paste command on the Manage ribbon, or type CTRL+V to paste the schedule into the project.

How do I transfer a panel schedule template in Revit?

Schedules can be modified using Edit Panel Schedules under the Manage tab. These can then be imported using “Transfer Project Standards”. This will import them to your active project from any other open project.

How do I move a row of data in Revit?

select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule. Enter values as desired.

Modify a Schedule

  1. To edit a cell, click in it. …
  2. To select a column, click a column index (the alphabetical cells between the title and header).
IT IS INTERESTING:  You asked: What does F4 do in AutoCAD?

How do you Unbreak a schedule in Revit?

Join Split Schedules on Sheets

  1. On a sheet that displays a split schedule, select the schedule. Use the 4-way arrow control to drag one schedule section over the other section.
  2. Release the mouse button. The split schedule sections rejoin into one section.

You can include elements from linked models in schedules of model elements (such as walls, floors, and roofs) and in drawing lists. They are not supported for note blocks, view lists, or key schedules.

In what views will detail lines show in a model?

Detail lines are visible only in the view in which they are drawn. Often they are drawn over the model view. You can convert detail lines to model lines.

How do you make a panel schedule?

Create a panel schedule

  1. Click Analyze tab Reports & Schedules panel Panel Schedules. Note: You can also open the Create Panel Schedules dialog by using the keyboard shortcut, PS .
  2. In the Create Panel Schedules dialog, select one or more panels, and click OK.

How do you change a panel schedule in Revit?

In a project, open the sheet that contains the panel schedule you want to modify. In the sheet view, select the panel schedule. Click Modify | Panel Schedule Graphics tab Create panel Edit Panel Schedule. You can now change the template, rebalance the loads, or use the manage circuit commands.

How do I merge rows in a Revit schedule?

select one or more rows in the title section, then click (Resize Row) and specify a value in the dialog. select cells in one or more rows and click (Delete Row). select header cells to be merged and click (Merge). Select merged cells and click (Merge) again to separate merged cells.

IT IS INTERESTING:  Which is better Solidworks or AutoCAD?

How do you merge columns in Revit?

From a schedule view, select a cell and click Modify Schedule | Quantities tab Parameters panel (Combine Parameters). If the column already contains a combined parameter, you can edit it; otherwise, you can create a combined parameter to display in this column.

How do I insert a row over in Revit?

Click (Above Selected) or (Below Selected) from the (Insert) drop-down menu on the Rows panel. select any cell. Click (Data Row) from the (Insert) drop-down menu on the Rows panel. The new row displays at the bottom of the schedule.

How do you split a long schedule on multiple Revit sheets?

Split a Schedule Across Multiple Sheets

  1. Do one of the following: …
  2. Select the sheets where the schedule segments will be placed. …
  3. Select the height for schedule segments on each sheet. …
  4. Click Split & Place.
  5. The first selected sheet is opened, click to place the schedule segment.