How do I monitor in Revit?

How do I monitor changes in Revit?

Open a view where you can see the elements to be monitored. Click Collaborate tab Coordinate panel Copy/Monitor drop-down (Use Current Project). Click Copy/Monitor tab Tools panel (Monitor).

What is the difference between copy and monitor in Revit?

When you start the Copy/Monitor tool, choose Select Link, and then select Copy, you can copy elements from a linked model to the current model, and monitor changes to the original elements. You can establish relationships between elements in the current project, and monitor changes to the elements.

Which elements can be copied and monitored in Revit?

Use the Copy/Monitor tool to monitor changes to the following types of elements:

  • Levels.
  • Grids (but not multi-segment grids)
  • Columns (but not slanted columns)
  • Walls.
  • Floors.
  • Openings.
  • MEP fixtures.

Why is a coordination review performed in Revit?

Review Warnings for Monitored Elements



After you establish relationships between elements using the Copy/Monitor tool, you can perform a coordination review to view and address any warnings generated by changes to those elements.

How do I stop my screen from copying?

After implementing Copy/Monitor to monitor elements for collaboration and coordination among teams, you can stop monitoring one or more elements when needed.

  1. Select one or more monitored elements. …
  2. Click Multi-Select tab or Modify | tab Monitor panel (Stop Monitoring).

How do I copy a monitor wall?

Go to the Collaborate tab, Coordinate panel, select the down arrow on Copy/Monitor and Select Link. In your view, select the link. You will see a dark border show up around it when you have it highlighted, left pick when you see that. Go to the Walls Tab and set each wall type to match the original wall type.

Can you copy monitor beams in Revit?

Copy/monitoring beams is currently not an option. It may never be. I was merely presenting an alternate workflow for addressing some of the issues C/M could resolve. Good or bad, there are many different ways to reach a solution using Revit.

Revit 2018. May 07 2020In-product view. Use the Bind Link tool to select the elements and datum from a linked model to convert to a group. In the drawing area, select the linked model.

IT IS INTERESTING:  How do you show planes in Solidworks drawing?
Special Project