The most common construction plans are plot plans (also called site plans), foundation plans, floor plans, and framing plans. A plot plan shows the contours, boundaries, roads, utilities, trees, structures, and other significant physical features on their sites.
What are the 6 types of construction drawings?
What Are the Six Types of Construction Drawings?
- Plans.
- Interior and exterior elevations.
- Building and wall sections.
- Interior and exterior details.
- Schedules and room finishes.
- Framing and utility plans.
What are line drawings in construction?
About Construction Lines. Construction lines help lay out small or detailed parts of a design on a sheet. You can draw them automatically one at a time, in sets of parallel lines, or freehand, point by point.
What are the 7 types of lines?
There are many types of lines: thick, thin, horizontal, vertical, zigzag, diagonal, curly, curved, spiral, etc. and are often very expressive.
Are construction lines thick or thin?
OBJECT OR VISIBLE LINES – Thick dark line use to show outline of object, visible edges and surfaces. 2. CONSTRUCTION LINE – Very light and thin line use to construct layout work. 3.
What is the heaviest line in a drawing?
The heaviest line weight indicates the ground line cut. The next heaviest line weight “profiles the planes closest to the plane of projection” (Ching & Juroszek, 1998, p. 152). Medium line weight indicates distance from picture plane, progressively getting lighter to describe objects further from the picture plane.
What are construction plans?
A construction plan is a set of documents that defines the requirements for a construction project, such as the activities, resources, schedule and budget. A construction plan is created during the construction planning process and includes the following: A written document that defines the methodologies and approach.
How long do construction drawings take?
For small alterations, renovations or additions, the construction stage could take 3 to 6 months. A typical new residential project of a significant size will take from between 6 to 9 months for construction.