Where is the work plane command in Revit?

Select a work plane-based element in a view. Click Modify | tab Work Plane panel (Edit Work Plane). Note: When you use the Edit Work Plane option, the new work plane must be parallel to the existing work plane.

How do you change work planes in Revit?

Change the Work Plane of an Element

  1. Select a work plane-based element in a view.
  2. Click Modify | <Element> tab Work Plane panel (Edit Work Plane). …
  3. In the Work Plane dialog, select another work plane. …
  4. If needed, reposition the element on the work plane.

What is the work plane command in Revit?

A work plane is a virtual 2-dimensional surface used as the origin for a view or for sketching elements. Work Plane Set or Show or Viewer. on the Architecture, Structure, or Systems tab in projects. on the Create tab of the Family Editor.

Why can I see the level below in Revit?

Follow these steps: In plan view, click View menu > View Properties. Click the Edit button for the View Range parameter. Enter a value for both the Bottom Offset, under Primary Range, and the Level Offset, under View Depth, that is more than 4 feet from the floor or slab.

IT IS INTERESTING:  What is a 3D polyline in Civil 3D?

What is Revit plan view?

The structural plan view is the default view when you start a new project using a structural template. … Revit provides for this variation with the View Direction type parameter for structural plans.

How do I get rid of work plane grid in Revit?

Do one of the following:

  1. Click (Dissociate Work Plane), which displays in the drawing area near the selected element.
  2. Use the Edit Work Plane tool: Click Modify | <Element> tab Work Plane panel (Edit Work Plane). In the Work Plane dialog, click Dissociate.

How do I delete a work plane in Revit?

Use the Delete item to delete the active Workplane. To delete the active Workplane click Workplane tab > Active panel > Delete.

How do you make a ref plane in Revit?

Use the Line tool or the Pick Line tool to draw a reference plane.

  1. On the ribbon, click (Reference Plane). Architecture tab Work Plane panel (Reference Plane) Structure tab Work Plane panel (Reference Plane) …
  2. To draw a line: On the Draw panel, click (Line). …
  3. To pick an existing line: On the Draw panel, click (Pick Lines).

How do you lock reference planes in Revit?

Add a Reference Plane

  1. On the Draw panel, click (Pick Lines).
  2. On the Options bar, specify an offset, if desired.
  3. Select the Lock option to lock the reference plane to the line.
  4. Move the cursor near the line to which you want to place the reference plane and click.

What is a Workplane in CAD?

A work plane is a modeling feature that defines the location of a plane in 3-dimensional (3D) space. … Work planes help you to define relationships between features and provide control when placing features. A work plane is displayed as a rectangular 2-dimensional (2D) object.

IT IS INTERESTING:  Is ANSI OSHA approved?

How do you hide an entire level in Revit?

Show or hide levels in 3D views

Click the Annotation Categories tab. In the Visibility column for Levels, select the check box to show levels in the view; clear the check box to hide them.

How do I turn on underlay in Revit?

Create an Underlay

  1. In the Project Browser, open a plan view.
  2. On the Properties palette, for Range: Base Level, select the level you want to underlay. Range: Top Level is automatically set to one level above the Base Level. …
  3. On the Properties palette, for Underlay Orientation, select Look Up or Look Down.

How do you show floor level in Revit?

Go to Solution. Change the View Properties to None for Underlays or the View Range if it has been changed to show the Bottom Primary depth or View Depth below the current view floor level. Reight-Click in the view and select View Properties or type in VP. worked.

Special Project