What items make up a construction drawing?

Construction Finishing drawings include every type of components of the building, such as painting colors, flooring pattern, plastering texture, elevation design, and false ceiling shapes.

What does a construction drawing include?

Construction drawings include all detailing for structural components as well as every layer of certified product that is to be installed, including manufacturer specifications for things like windows and doors, insulation, airtightness and thermal bridging details as well as how ventilation units and ducts are to be …

How do you make a construction drawing?

Steps to Draw a Building Plan

  1. Create a beginning point and proper scale for the project.
  2. Practice altering the scale.
  3. Create a plan of building and current property lines to scale, which should be done in an overhead view.
  4. Add some information to the plan.
  5. Sketch the details of the property.
  6. Label everything.

What are the 6 types of construction drawings?

What Are the Six Types of Construction Drawings?

  • Plans.
  • Interior and exterior elevations.
  • Building and wall sections.
  • Interior and exterior details.
  • Schedules and room finishes.
  • Framing and utility plans.

What are the 5 basic components of construction drawings?

5 Types of Construction Drawings Used in Commercial Construction

  • 1 Architectural Drawings: This is one of the types of construction drawings. …
  • Structural Drawings: …
  • Electrical Drawings: …
  • Plumbing and Sanitary Drawings: …
  • Finishing Drawing:
IT IS INTERESTING:  Frequent question: What does STL stand for in construction?

What are the 3 types of construction?

Broadly, there are three sectors of construction: buildings, infrastructure and industrial: Building construction is usually further divided into residential and non-residential.

How long do construction drawings take?

For small alterations, renovations or additions, the construction stage could take 3 to 6 months. A typical new residential project of a significant size will take from between 6 to 9 months for construction.

What are construction plans?

A construction plan is a set of documents that defines the requirements for a construction project, such as the activities, resources, schedule and budget. A construction plan is created during the construction planning process and includes the following: A written document that defines the methodologies and approach.