What is Survey point in Revit?

The survey point provides a real-world context for the Revit model. It represents a known point in the physical world, such as a geodetic survey marker or the intersection of 2 property lines. … In a Revit model, the survey point defines a reference point for the survey coordinate system.

How do you use survey points in Revit?

Define the Survey Point

  1. Open the site plan view or another view that displays it. …
  2. To select the survey point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. If the survey point is clipped, click to unclip it.
  4. Drag the survey point to the desired location.

What is survey point and project base point in Revit?

To move the entire model in relation to the survey point, move the clipped project base point. Clipping ensures that relative location of project base point and project (building) is fixed. To move the project base point to another location on the model, move the unclipped project base point.

Where is the survey point in Revit?

In Visibility / Graphics settings window go to Model Categories -> Visibility -> Site and make sure that “Survey Point” is enabled. After that in the Revit site view, the Survey Point block should appear.

IT IS INTERESTING:  How do i clear my cache in autocad?

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

How do I project a base point in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. Drag the project base point to the desired location.

What is Project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. … When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.

dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

How do I reset a project base point in Revit?

If you later want to return the project base point to its startup location, do the following:

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.
IT IS INTERESTING:  Frequent question: Can you free hand in Autocad?

How do I hide survey points in Revit?

To temporarily display the project base point and the survey point in a view, on the View Control Bar click (Reveal Hidden Elements).

How do you match coordinates in Revit?

Help

  1. Optional: Display the project base point and the survey point in the current view.
  2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
  3. Place the cursor on a reference point of the model. …
  4. Click the reference. …
  5. Enter values for the selected reference. …
  6. Click OK.

Where is the Revit origin?

On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point. To display the internal origin, select Internal Origin.

Special Project