What is survey point and project base point in Revit?

What is the difference between survey point and project base point?

Moving an unclipped survey point moves only the survey point relative to the shared coordinate and the project coordinate systems. Project coordinates do not change for the model elements. Shared coordinates do not change for the model elements. Only the shared coordinates of the survey point itself change.

How do you use project base point and survey point in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

What is a project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. … When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.

IT IS INTERESTING:  Question: Will Revit be available for Mac?

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

What is the survey point?

The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application. In a Revit model, the survey point defines a reference point for the survey coordinate system.

How do you find a project base point in Revit?

Click View tab Graphics panel (Visibility/Graphics). On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point.

How do I reset a project base point in Revit?

If you later want to return the project base point to its startup location, do the following:

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.

What is the method to georeference a Revit file?

Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.

How do you apply a project base point in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. Drag the project base point to the desired location.
IT IS INTERESTING:  What type of computer do I need to run SOLIDWORKS?

What is a project point?

ProjectPoint is a Syneos Health web site, built on Microsoft’s SharePoint technology, used for the sharing of ideas, files, information, and knowledge between Syneos Health and external users. External users include sponsors, investigators, clients, customers and/or vendors.

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.

dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.
Special Project