Quick Answer: What is duplicate view as dependent in Revit?

What is a Dependant view in Revit?

You can create multiple copies of a view that are dependent on the primary view. All copies, known as dependent views, remain synchronous with the primary view and all other dependent views, so that when view-specific changes (such as view scale and annotations) are made in one view, they are reflected in all views.

What does duplicate in Revit mean?

Duplicate creates a duplicate view with no annotations. ( doesn’t copy annotations) Duplicate with detailing creates a duplicate view including the annotations. The annotation after the “create” are independent of each other. ( Copies annotations, but doesn’t reflect new annotations to copied from view)

How do you duplicate a view independent in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

What is the difference between duplicate and duplicate with detailing in Revit?

The Duplicate option creates a duplicate view of the model elements within the view. The Duplicate with detailing option creates a duplicate view including the detail and annotations elements. They are independent from elements of the parent view.

IT IS INTERESTING:  Quick Answer: How do you dock properties and project browser in Revit?

How can duplicate with Dependent be used?

Duplicate as Dependent



Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects. What this means is if you add a dimension in the ordinal view all dependent views will also have the new dimension.

How do you create a dependent view?

Create Dependent Views

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.

How do you duplicate a schedule in Revit?

Duplicate a Schedule

  1. Right-Click the schedule name in the Project Browser.
  2. In the context menu select Duplicate. Note: If the schedule has been split across sheets into segments, an additional selection will be available, Duplicate with Segments. This will duplicate the schedule and retain the segments created.

What would be the best workflow when using massing tools in Revit?

You can create wall, floor, or roof elements by modeling them using the create tools on the Architecture tab or by using the Model by Face tool on the Massing & Site tab. It is typically best to start by converting the mass floors in your conceptual model into Revit building elements.

How do you duplicate a model in Revit?

Click Manage tab Design Options panel (Design Options). In the Design Options dialog, select the design option from the list. Under Option, click Duplicate. Revit creates a copy of the selected design option named Copy of .

IT IS INTERESTING:  Can you uninstall and reinstall SolidWorks?

How do you duplicate multiple views in Revit?

It’s real easy to duplicate views in Revit. Simply select the view in the project browser, right-click and choose “Duplicate View” from the list.

What occurs when creating a new view by duplicate with detailing?

When you select “Duplicate with Detailing,” the model geometry of the view is duplicated as well as the annotation and detailing elements. An example of using this kind of duplication would be when you want to add information to a duplicate of the view, and keep the original version unaltered.

What is a face based family?

Face-based. Use the face-based template to create work plane-based families that can modify their hosts. Families created from the template can make complex cuts in hosts. Instances of these families can be placed on any surface, regardless of its orientation. See Creating a Work Plane-based Family.

How do you duplicate a floor in Revit?

Solution:

  1. Copy to Clipboard (CTRL+C) or from the Modify ribbon>Clipboard panel, choose Copy.
  2. On the Modify ribbon > Clipboard, click the drop down arrow under the Paste command.
  3. Select “Aligned to Selected Levels”
  4. Choose the Target level (i.e. Level 2)
  5. Switch to a 3D View to see the results.
Special Project