Question: How do I move a project to another project in Revit?

How do I move a project from one Revit to another?

Open an existing model, and link another model to it.

  1. Open an existing model or start a new model. You will link another model into this model.
  2. Click Insert tab Link panel (Link Revit).
  3. In the Import/Link RVT dialog, select the model to link. …
  4. For Positioning, specify the desired option. …
  5. Click Open.

Can you copy and paste from one Revit project to another?

Go to the file you want to copy from, highlight the objects to copy and type “Ctrl-C” (that is, hold down the Ctrl key and type “C”). Then open the file you want to paste that element into and type “Ctrl-V.”

Can you transfer sheets from one project to another in Revit?

There are limitations on how Revit will allow Sheets to be transferred between projects. Specifically, Revit will not import/export Sheets that contain model views.

How do I import a project into Revit?

Load the Current Family into a Project

  1. In the Family Editor, click Create tab Family Editor panel (Load into Project). The family will remain open. …
  2. If multiple projects are open, the Load into Projects dialog displays. Select the open projects to receive the family, and click OK.
IT IS INTERESTING:  You asked: Is ArchiCAD used in the US?

Revit 2018. May 07 2020In-product view. Use the Bind Link tool to select the elements and datum from a linked model to convert to a group. In the drawing area, select the linked model.

How do I move a project between families in Revit?

Ways to Transfer Revit Families from One Project to Another



To start with, open the source project where the required families are. Then, in Project Browser navigate to Families section and right-click on it. Choose Save… then choose a folder to save your families to, and next in Family to save field leave option.

How do I copy a level from one Revit file to another?

Copy the levels for monitoring:

  1. Click Copy/Monitor tab Tools panel (Copy).
  2. In the linked model, select the levels to copy. To select multiple levels, on the Options Bar, select Multiple. Then select the levels in the drawing area, and click Finish on the Options Bar. …
  3. Click Copy/Monitor tab Copy/Monitor panel (Finish).

How do you copy a floor plan from one project to another in Revit?

If you are just trying to get a 2nd floor plan of the same floor in the same project you can do that by right clicking the plan in the project browser. Then choose “Duplicate” or “Duplicate with Detailing”. Duplicate takes the exact floor plan and strips off all view specific (detail and annotation) elements.

How do I copy a drafting view from one project to another?

Insert a Drafting View from Another Project

  1. Open the target Revit project (that is, the project in which you want to insert the existing drafting view).
  2. Click Insert tab Import panel Insert from File drop-down Insert Views from File.
  3. In the Open dialog, select a project file, and click Open.
IT IS INTERESTING:  Quick Answer: How do you save assembly configurations in Solidworks?

Can I copy View template to another project Revit?

Open both the source and target projects. In the target project, click Manage tab Settings panel (Transfer Project Standards). In the Select Items to Copy dialog, select the source project for Copy from. Select the desired project standards.

How do you duplicate a project in Revit?

In the Design Options dialog, select the design option from the list. Under Option, click Duplicate. Revit creates a copy of the selected design option named Copy of . To rename the duplicate design option, select the option name, and under Option, click Rename.

Special Project