How do you make a view in Revit?

Use the shortcut CTRL+9 (CMD+3 in AutoCAD for Mac) to toggle on the command line. Type in the COMMANDLINE command.

How do I create a primary view in Revit?

To go to the primary view from a dependent view, right-click a dependent view crop boundary, and click Go to Primary View.

How do I create a detail view in Revit 2020?

Help

  1. Do one of the following to activate the view creation tool: …
  2. From the Type Selector, select Detail View: Detail.
  3. On the Options Bar, select an appropriate detail scale.
  4. To reference another detail or drafting view, on the Reference panel, select Reference Other View, and select a view from the drop-down list.

What is view type in Revit?

A view type defines some graphics properties, such as a reference label and tags for elevations, callouts, or sections. It can also specify a view template to apply to a new view, and whether template updates should be applied to existing views.

What is a dependent view in Revit?

Make multiple copies of a view that are dependent on the primary view. All copies, known as dependent views, remain synchronous with the primary view and all other dependent views, so that when view-specific changes (such as view scale and annotations) are made in one view, they are reflected in all views.

IT IS INTERESTING:  Quick Answer: Can you use SketchUp on 2 devices?

How do you make a dependent view in Revit?

Create dependent views from the Project Browser.

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.

How do you create new text styles in Revit?

Specify Text Note Styles

  1. Click Annotate tab Text panel .
  2. In the Type Properties dialog, select the text properties you want to work with from the Type list.
  3. If desired, click Rename to rename the type, or click Duplicate to create a new text type.
  4. Specify the properties for the display of text notes.
  5. Click OK.

How do you label a callout in Revit?

Change the Tag of a Callout

  1. In the parent view, select the callout bubble.
  2. On the Properties palette, click (Edit Type).
  3. In the Type Properties dialog, for Callout Tag, select the callout tag to use. If the desired callout tag is not listed, you can create a new callout tag. …
  4. Click OK to save your changes.

How do I change the view type in Revit?

Open a view for which you want to create a view type, or click the view name in the Project Browser. In the Properties palette, click Edit Type. In the Type Properties dialog, click Duplicate. Enter a name for the new view type and click OK.

How do I change the view classification in Revit?

Right click on Views then click Browser Organization on the context menu. In the Browser Organization dialog, click New. Type “Category” for the new Views name. Click OK.

IT IS INTERESTING:  How do i turn off a layer layout in autocad?

What does duplicate as dependent mean in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

How do you create a Matchline in Revit?

Add a Matchline

  1. Open the primary view from which your dependent views were created.
  2. If crop regions are not visible, click (Show Crop Region) on the View Control Bar. …
  3. Click View tab Sheet Composition panel (Matchline).
  4. Sketch the matchline.
  5. When finished, click Finish Matchline.