How do you create a project location in Revit?

How do I add a site location in Revit?

In the ribbon, click the Insert tab > Link panel > Link Revit.



Create a new shared site and rename it.

  1. Select the survey point.
  2. In the Location Weather and Site dialog, in the Site tab, select the default shared site and click Duplicate….
  3. Enter a name for the site (e.g. SITE_01).
  4. Click OK.

How do I set a project base point in Revit 2020?

To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. If it says Site: Survey Point, press Tab until it says Site: Project Base Point. Click to select the project base point. Drag the project base point to the desired location.

How do you change the project point in Revit?

To move the project base point:

  1. In the site plan view or another view that displays the project base point, select it.
  2. Click the clip to change its state to clipped or unclipped, depending on how you want to move the project base point.
  3. Drag the project base point to the desired location.
IT IS INTERESTING:  What is the use of extrude command in autocad?

How do I create a project in Revit?

Create a project in Revit and enter project-specific information.

  1. Create the project. Use a project template provided by your CAD/BIM manager, or use a default template.
  2. Specify project information. Enter the client name, project name, number, and address.
  3. Define positioning. …
  4. Create construction phases.

How do I create a site plan in Revit 2021?

Create the Site Plan

  1. Define site settings. …
  2. Create the toposurface. …
  3. Rotate the project to True North. …
  4. Specify property lines. …
  5. Add a building pad. …
  6. Grade the toposurface. …
  7. Create parking lots, roads, and sidewalks. …
  8. Add site components.

Where is project base point Revit?

When you first create a Revit model, the project base point is located at the internal origin.

How do you align a project base point in Revit?

Auto – Project Base Point to Project Base Point



If the host model’s project base point changes, the linked model does not reflect the change. To reposition the linked model, select it, right-click, and click Reposition to Project Base Point.

How do you set the elevation of a project in Revit?

Manage tab> Project Location> Coordinates> Specify Coordinates at Point:

  1. Select the ground level line and specify elevation:
  2. Ground level still says 0. Select the ground level line and change the type to Shared Datum:
  3. Ground level now shows the Shared Datum levels:

How do I move an origin project to Revit?

Move the project base point to the internal origin

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.
IT IS INTERESTING:  Best answer: How do I edit a linear pattern in Solidworks?

Where is the survey point in Revit?

First, make sure that Survey Point is enabled in Visibility / Graphics settings. In Visibility / Graphics settings window go to Model Categories -> Visibility -> Site and make sure that “Survey Point” is enabled. After that in the Revit site view, the Survey Point block should appear.