How do I edit text in a schedule in Revit?

How do you edit a cell in a schedule in Revit?

Any cell can be edited in panel schedules. select one or more rows in the title section, then click (Resize Row) and specify a value in the dialog. select cells or columns, then click (Reset). Conditional formatting will remain intact.

How do you add text to a schedule in Revit?

It relies on the ability to reference Project Information parameters in schedules.

  1. Create a project parameter -> -> Common -> Multiline Text -> Text (or whatever), and assign it to the Project Information category.
  2. Add the parameter as a column to the desired schedule.

Why can’t I edit schedule in Revit?

issue: Some schedule fields in Revit are not editable. Cause: In some instances, schedules created in Revit and viewed in Revit will not be editable. Schedules will be shown correctly, but the column containing the column containing the combined parameter will not be able to be edited.

How do you crop a schedule in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again. …
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.

How do you highlight a schedule in Revit?

How to manually highlight rows within a Revit schedule with…

  1. Open the Planting schedule. …
  2. Name the new Parameter ‘Colour On’ and set the Type to a ‘Yes/No’ parameter. …
  3. Click OK. …
  4. Now click the Edit button next to the Formatting part in the Properties pallet.

How do you unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

How do I add rows to a Revit schedule?

select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule. Enter values as desired.



Modify a Schedule

  1. To edit a cell, click in it. …
  2. To select a column, click a column index (the alphabetical cells between the title and header).

How do I move a column in Revit schedule?

You can move the column by selecting the column and dragging it to the new location.

How do I edit a sheet list in Revit?

In the Project Browser, under Schedules/Quantities, click the sheet list name. On the Properties palette, for Fields, click Edit. Add a custom field named Sheet Order, as follows: On the Fields tab of the Sheet List Properties dialog, click Add Parameter.

IT IS INTERESTING:  How do you insert a lisp in autocad?
Special Project