How do I edit a Revit finish schedule?

How do I edit an existing schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

Why can’t I edit schedule in Revit?

issue: Some schedule fields in Revit are not editable. Cause: In some instances, schedules created in Revit and viewed in Revit will not be editable. Schedules will be shown correctly, but the column containing the column containing the combined parameter will not be able to be edited.

How do I add a row to a Revit finish schedule?

select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule. Enter values as desired.



Modify a Schedule

  1. To edit a cell, click in it. …
  2. To select a column, click a column index (the alphabetical cells between the title and header).

How do I create a material finish schedule in Revit?

Click View tab Create panel Schedules drop-down Material Takeoff. In the New Material Takeoff dialog, click a category for the material takeoff schedule, and click OK. In the Material Takeoff Properties dialog, for Available Fields, select the material attributes. Optionally, sort and group, or format the schedule.

IT IS INTERESTING:  How do I download Revit family?

How do you crop a schedule in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again. …
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.

How do you unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

How do I move a column in Revit schedule?

You can move the column by selecting the column and dragging it to the new location.

Why can’t I insert a row in a Revit schedule?

If we don’t check the Itemize every instance option on the Sorting/Grouping tab the Insert Data Row is disabled. The other culprit is using the Embedded Schedule feature.

How do I add a schedule in Revit?

Create a Key Schedule

  1. Click View tab Create panel Schedules drop-down Schedule/Quantities.
  2. In the New Schedule dialog, select the element category for which you want to schedule keys.
  3. Select Schedule keys. …
  4. Click OK.
  5. In the Schedule Properties dialog, add the predefined fields for the style. …
  6. Click OK.

How do you add a component to a schedule in Revit?

When needed, add a list of building element components to your model. Click View tab Create panel Schedules drop-down Schedule/Quantities.



In the New Schedule dialog, do the following:

  1. Select a component from the category list. …
  2. Select Schedule building components. …
  3. Specify the phase.
  4. Click OK.
IT IS INTERESTING:  You asked: How does 3D CAD work?

What does a finish schedule look like?

What is a finish schedule and why does it matter? A Finish Schedule is a form of product specification writing that outlines the materials desired on a construction project. Specifically, a Finish Schedule outlines floor, wall, ceiling materials and excludes lighting, windows, doors, and furniture.