How do I change order of orders in SolidWorks?

How do I change my order in BOM solidworks?

Bill of Materials Sort

  1. Right-click anywhere in the Bill of Materials table and select Sort.
  2. Edit the options in the Sort dialog box as described below, then click OK.

How do you rearrange trees in Solidworks?

To open the Move Tree dialog box, select the file and click Tools > Move Tree.



Move Tree

  1. Include simulation: Moves SOLIDWORKS Simulation results associated to the selected files.
  2. Preserve relative paths: Keeps the paths of references relative to the moved parent file, creating a folder structure as needed.

How do I change the item number in Solidworks?

To assign a new item number to the replaced component and keep it in the same row, in the Bill of Materials PropertyManager, select Keep Missing Item and Assign new item number and do not keep replaced component.

How do you change the balloon number in Solidworks?

To change the balloon properties: Select the balloon and edit the properties in the Balloon PropertyManager. Right-click the balloon and select Properties. Make changes in the Note PropertyManager and click OK.

IT IS INTERESTING:  How do I save Draftsight as a PDF?

How do you use bill of materials in Solidworks?

Creating Bills of Materials from Parts or Assemblies

  1. With the part or assembly open, select Insert > Tables > Bill of Materials.
  2. Set the BOM properties in the Bill of Materials PropertyManager and click . To create a parts-only BOM, select Parts only for BOM Type. …
  3. Click the graphics area to place the BOM.

How do I use Solidworks pack and go?

To access Pack and Go:

  1. In SOLIDWORKS, click File > Pack and Go.
  2. In File Explorer or SOLIDWORKS Task Pane File Explorer, right-click a SOLIDWORKS document and click SOLIDWORKS > Pack and Go .

How do you copy a tree in Solidworks?

To perform a Copy Tree, open the PDM vault and navigate to the folder or top-level file you would like to copy, highlight it, select tools from the above toolbar, then select Copy Tree from the pop-out menu. The Copy Tree dialog box will then open, displaying the many options for your copy function.

How do I change the part number in Solidworks BOM?

Search ‘Managing Part Number Settings’ in the SOLIDWORKS Knowledge Base.



To change the part number or description of the saved settings:

  1. Under Part Numbers, select the part number saved settings.
  2. Click Edit.
  3. In the Part Number dialog box, change Part number, Description, or both.
  4. Click OK.

How do I change the template of a BOM in Solidworks?

Insert (Menu) > Tables > Bill of Materials. Click the “Favorites” button beside the default BOM Template name. Browse and select the desired BOM Template from the directory.

How do you use property managers in Solidworks?

The PropertyManager appears on the PropertyManager tab in the panel to the left of the graphics area. It opens when you select entities or commands defined in the PropertyManager. You can choose whether it opens in other cases in Tools > Options > System Options > General .

IT IS INTERESTING:  How do i install autodesk license service?

How do I reorder Bill of Materials in SolidWorks?

You can reorder a named BOM list. Select one or more components in a named BOM. Drag them to another location in the list.

How do you rearrange bills of materials in SolidWorks?

You can change the order of components in a BOM. To reorder a named BOM list: Select one or more components in a named BOM. Drag them to another location in the list.

How can I change my part number in Bill of Materials?

In the part or subassembly document, click the ConfigurationManager tab at the top of the left panel. Right-click the configuration you want to edit, and select Properties.



Bill of Materials – Part Number Column

  1. Document Name.
  2. Configuration Name.
  3. User Specified Name. Type a name in the box.
Special Project