How do I add a revision tag in Revit?

How do you add a revision tag?

To Add Revision Tags to a Drawing

  1. On the ribbon, click Annotate tab Table panel Revision Tag .
  2. If a revision table exists in the drawing or on the drawing sheet, continue with step 3. …
  3. In the graphics window, click to pick the location for the revision tag. …
  4. Right-click, and then select Continue from the menu.

How do you edit a revision cloud tag in Revit?

Modify a Revision Cloud

  1. Click Modify | Revision Clouds tab Mode panel (Edit Sketch). Revit enters sketch mode.
  2. Select segments of the revision cloud, and drag the endpoints to adjust its boundaries.
  3. Click Modify Revision Clouds > Edit Sketch tab Mode panel (Finish Edit Mode).

How do I add a revision cloud in Revit?

Add a Revision Cloud

  1. In the project, open a view in which you want to indicate changes. …
  2. Click Annotate tab Detail panel (Revision Cloud). …
  3. On the Tools panel, click one of the draw tools.
  4. In the drawing area, place the cursor near the part of the view that has changed and draw the cloud to encompass the changed area.

What is a revision tag on a swing set?

A revision tag is a textual label that can be associated with a specific revision of a project maintained by a version control system. … This label can then be used in place of the revision identifier for commands supported by the version control system.

IT IS INTERESTING:  What is realistic AutoCAD?

What is a revision cloud?

Revision clouds are closed polylines that form cloud-shaped objects consisting of arc segments. If you review or markup drawings, you can use the revision cloud feature to call attention to portions of each drawing.

Can you schedule revision clouds in Revit?

By default, the revision schedule on a sheet lists the revisions relating to revision clouds in the views of the sheet. If desired, you can list additional revisions on the revision schedule.

How do you change the radius of a revision cloud in Revit?

Click Modify | Revision Clouds tab Mode panel (Edit Sketch).



  1. In the project, click Manage tab Settings panel (Object Styles).
  2. Click the Annotation Objects tab.
  3. For Revision Clouds, change the values for Line Weight, Line Color, and Line Pattern.
  4. Click OK. These changes apply to all revision clouds in the project.

How do you use a revision cloud?

Convert an Object to a Revision Cloud

  1. Click Home tab Draw panel Revision Cloud drop-down. Find.
  2. In the drawing area, right-click and choose Object.
  3. Select a circle, ellipse, polyline, or spline that you want to convert to a revision cloud.
  4. Press Enter to keep the current direction of the arcs. …
  5. Press Enter.

How do you create a revision schedule in Revit?

In the Project Browser, double-click the empty node under Sheets (all). The title block displays in the drawing area. In the Project Browser, under Views (all) Schedules, select the revision schedule, and drag it to the drawing area. Place the revision schedule in the desired location on the title block.

IT IS INTERESTING:  How do you cut a void form in Revit?
Special Project