Frequent question: How do you change the revision on a sheet in Revit?

Double-click on the image in the Materials Editor palette and expand the Scale panel in the Texture Editor palette. Set the scale to 10 inches in width and height and select None in the Horizontal and Vertical fields of the Repeat panel.

How do I change revision number in Revit?

In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions). In the Sheet Issues/Revisions dialog, under Customize Numbering, click Numbering. In the numbering dialog, click (New). In the New numbering sequence dialog, enter a name.

How do I remove a revision from a sheet in Revit?

Delete Revisions

  1. Click View tab Sheet Composition panel (Sheet Issues/Revisions).
  2. Click the sequence number for the revision you wish to delete. Optionally, press and hold Ctrl, then click to select multiple sequence numbers to delete.
  3. Click Delete. …
  4. At the confirmation message, click OK. …
  5. Click OK.

How do I change revision schedule in Revit?

Modify the revision schedule properties, as follows:

  1. In the Project Browser, under Views (all) Schedules, click Revision Schedule.
  2. On the Properties palette, for Appearance, click Edit.
  3. On the Appearance tab of the Revision Properties dialog, for Height, select User defined.
  4. Click OK.
IT IS INTERESTING:  Can gimp convert PNG to SVG?

How do you add revision to every sheet in Revit?

In the Revision menu, you will find the Set Revisions On Sheet menu. Select the revision you want to add. Then, you will have to select the sheets to which you want to add the specific revision. If you look at the revision schedule inside one of the selected sheets, you will see the selected revision has been added.

How do you manage sheets in Revit?

Create a Sheet List

  1. In a project, click View tab Create panel Schedules drop-down (Sheet List).
  2. On the Fields tab of the Sheet List Properties dialog, select the fields to include in the sheet list.
  3. (Optional) To create user-defined fields, click Add Parameter.

How do I make multiple worksheets in Revit?

Create multiple sheets

  1. Select views, where you choose from existing views in your project. …
  2. Select levels, where you choose levels in a list and the application creates new floor plans. …
  3. Specify number of drawings, where you specify the number of copies you want of your template drawing.

How do you show revision clouds in Revit?

Add a Revision Cloud

  1. In the project, open a view in which you want to indicate changes. …
  2. Click Annotate tab Detail panel (Revision Cloud). …
  3. On the Tools panel, click one of the draw tools.
  4. In the drawing area, place the cursor near the part of the view that has changed and draw the cloud to encompass the changed area.

How do you turn off revision clouds in Revit?

The reason that the Revit Revision Box is non editable / greyed out on the sheet is because there is a cloud or series of clouds on the sheet that are not visible. To resolve this, go to the Manage Tab → Additional Settings → Sheet Issues / Revisions.

IT IS INTERESTING:  How do I turn off hatch preview in AutoCAD?

Why is shown in revision schedule greyed out?

1) The box is checked and greyed out because there are clouds assigned to that revision in one of the views on that sheet. 2) Go into your revisions and make sure it shows clouds and tags for the revision you want to uncheck. You will need to erase those clouds to be able to uncheck that revision on the sheet.

How do I change revision info in Revit?

Enter Revision Information

  1. In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions). …
  2. To add a new revision, click Add. …
  3. In the revision row, for Numbering, select Numeric, Alphanumeric, or None.
  4. For Date, enter the date on which the revisions are made or will be sent for review.

How do I turn off revision in Revit?

Hide a Revision Cloud

  1. Sheet Issues/Revisions dialog. Use the Show column to indicate whether revision clouds and tags display for each revision. This setting affects all views in the project.
  2. Hide in View > Category. In a view, select one or more revision clouds, right-click, and click Hide in View Category.