Frequent question: How do I copy a legend from one project to another in Revit?

How do you copy a legend?

While it is not possible to copy an entire legend object and paste it onto a graph, it is possible to copy and paste just the text portion of the legend. Double-click to edit the legend, select a portion (or all) of the text, and copy to the clipboard Then go to the second graph (or stay on the same one), and paste.

Can you import legends in Revit?

The Transfer Legend add-in for Autodesk® Revit® is a free application that helps you to transfer/copy existing legends from a Revit linked document file to the current document with a few simple clicks.

How do you save a legend in Revit?

You can copy – paste legends from file to file. Create a minimum project and place the legend(s) in that, then just open that file in the same Revit session and copy paste between the projects. This legend may be something you want in your template file.

How do I separate a chart from a legend?

Hiding the legend from Chart 1 is simple and can be accomplished as follows:

  1. Single click on the chart.
  2. Select Chart | Chart Options. Excel displays the Chart Options dialog box.
  3. Click on the Legends tab.
  4. Clear the Show Legend check box.
  5. Click OK.
IT IS INTERESTING:  How do i fix my autodesk license?

Where do you put a legend on a graph?

Legend in the plot margin for a scatter or line plot



The legend is placed in the right margin.

Can legend views be added to multiple sheets?

You can place a legend view on multiple sheets.

How do you align Legends in Revit?

Drag the legend into your sheet. Zoom in close to one corner and, with the legend view selected, use the arrow keys to reposition it. If you drag more than one legend onto a sheet, you should get the alignment temporary lines (just like you do with other views on sheets and text notes).

Which view type can be placed on more than one sheet in Revit?

A view can only be placed on one sheet and cannot be used in multiple sheets at any one time. To have a similar view placed in multiple sheets, you must duplicate the Views as Dependents and place the new view onto the sheet: Below are the different options when Duplicate View is selected.

Special Project