Best answer: What is duplicate as dependent in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

What is the difference between duplicate and duplicate with detailing in Revit?

When you select the “duplicate” option, an exact duplicate of the view is created, without the annotation and detailing items. … When you select “Duplicate with Detailing,” the model geometry of the view is duplicated as well as the annotation and detailing elements.

How can duplicate with Dependent be used?

Duplicate as Dependent



Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects. What this means is if you add a dimension in the ordinal view all dependent views will also have the new dimension.

IT IS INTERESTING:  How do I open a drawing in DraftSight?

What is duplicate with detailing?

The Duplicate with detailing option creates a duplicate view including the detail and annotations elements. They are independent from elements of the parent view. The Duplicate as dependent option creates a dependent view that behaves as the parent view.

How do you duplicate with detailing in Revit?

To copy the model geometry from an existing view into a new view, right-click the existing view in the Project Browser, and click Duplicate View Duplicate. If you right-click, and click Duplicate View Duplicate with Detailing, both the model geometry and the detail geometry are copied into the new view.

How do you duplicate floor plans in Revit?

Solution:

  1. Copy to Clipboard (CTRL+C) or from the Modify ribbon>Clipboard panel, choose Copy.
  2. On the Modify ribbon > Clipboard, click the drop down arrow under the Paste command.
  3. Select “Aligned to Selected Levels”
  4. Choose the Target level (i.e. Level 2)
  5. Switch to a 3D View to see the results.

What type of view do you need to be in to add a level to your project?

Open the section or elevation view to add levels to. On the ribbon, click (Level). Place the cursor in the drawing area and click. Note: As you place the cursor to create a level, if the cursor aligns to an existing level line, a temporary vertical dimension displays between the cursor and that level line.

How do you make an independent view in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

IT IS INTERESTING:  How do I change the toolbar in rhino?

How do you create a Matchline in Revit?

Add a Matchline

  1. Open the primary view from which your dependent views were created.
  2. If crop regions are not visible, click (Show Crop Region) on the View Control Bar. …
  3. Click View tab Sheet Composition panel (Matchline).
  4. Sketch the matchline.
  5. When finished, click Finish Matchline.

When placing a door window or component you select the family that you want to use in the?

In the Type Selector at the top of the Properties palette, select the desired component type. If the desired component family has not yet been loaded into the project, click Modify | Place Component tab Mode panel Load Family.

How do you copy a view?

Create a copy of a view

  1. Sign in to Google Analytics..
  2. Click Admin, and navigate to the view you want to copy.
  3. In the VIEW column, click View Settings.
  4. Click Copy view.
  5. Give this a new view name. Use a distinct name, so you can distinguish it from the original view.
  6. Click Copy View.
Special Project