Best answer: How do you use survey points in Revit?

Where do you put survey points in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

How do you enter survey coordinates in Revit?

Define the Survey Point

  1. Open the site plan view or another view that displays it. …
  2. To select the survey point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. If the survey point is clipped, click to unclip it.
  4. Drag the survey point to the desired location.

What is survey point and project base point in Revit?

Project Base Points and Survey Points. Every project has a project base point and a survey point , although they might not be visible in all views, because of visibility settings and view clippings. They cannot be deleted. The project base point defines the origin (0,0,0) of the project coordinate system.

What are the 3 points in Revit?

There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.

IT IS INTERESTING:  Your question: How do I change an object's layer in Lumion?

How do you set the elevation of a project in Revit?

Manage tab> Project Location> Coordinates> Specify Coordinates at Point:

  1. Select the ground level line and specify elevation:
  2. Ground level still says 0. Select the ground level line and change the type to Shared Datum:
  3. Ground level now shows the Shared Datum levels:

How do you align a project base point in Revit?

Auto – Project Base Point to Project Base Point



If the host model’s project base point changes, the linked model does not reflect the change. To reposition the linked model, select it, right-click, and click Reposition to Project Base Point.