Quick Answer: How do I move a view from one project to another in Revit?

How do you move a viewport in Revit?

Click Modify | Viewports tab Viewport panel (Activate View). Revit displays the sheet title block and its contents in halftone. Only the contents of the active view display normally. You can now edit the view as desired.

Can you copy views between Revit models?

While Revit allows inserting Drafting views and schedules from an existing project, it does not have built in options to allow copying/inserting 3D / Plan views between different Revit projects. If you are looking re-use just a few views, then it would probably be simpler to create new views in the new project.

How do you duplicate a 3D view in Revit?

To duplicate a view, right-click the view title in the Project Browser. The 3 duplicate options are listed. When you select the “duplicate” option, an exact duplicate of the view is created, without the annotation and detailing items. With duplicate, only the model geometry of the view is included.

How do I resize a viewport in Revit?

Right-click the activated view, and click Pan Active View. Drag the cursor to pan the view. Change the scale of the view. On the View Control Bar, for Scale, select the desired scale.

IT IS INTERESTING:  Is GTX 1660 good for architecture?

How do you increase viewport in Revit?

Add dimensions and text notes, pan the viewport, or change the scale of a view to accommodate project needs.

  1. Open the sheet.
  2. In the drawing area, select a view on the sheet. …
  3. Click Modify | Viewports tab Viewport panel (Activate View). …
  4. Modify the view as desired.

How do I change the view type in Revit?

Open a view for which you want to create a view type, or click the view name in the Project Browser. In the Properties palette, click Edit Type. In the Type Properties dialog, click Duplicate. Enter a name for the new view type and click OK.

Can Revit not duplicate existing views?

Go to View > Plans Views > Floor plan. Uncheck “Do not duplicate existing views”. Select the same Level from step one. Select OK.

What does duplicate as dependent mean in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.