Quick Answer: How do I copy a project schedule in Revit?

How do I move a schedule from one project to another in Revit?

Use a Schedule in Another Model

  1. Click Insert tab Import panel Insert from File drop-down Insert Views from File.
  2. Select a Revit project that contains the views to insert, and click Open. …
  3. Select the views to display from the list.
  4. Check the views you would like to insert, and click OK.

How do I export a Revit schedule?

Export a Schedule

  1. Open a schedule view.
  2. Click File tab Export Reports Schedule.
  3. In the Export Schedule dialog, specify a name and directory for the schedule, and click Save. …
  4. Under Schedule appearance, select export options: …
  5. Under Output options, specify how you want to display the data in the output file: …
  6. Click OK.

How do I create a dummy schedule in Revit?

Create a Key Schedule

  1. Click View tab Create panel Schedules drop-down Schedule/Quantities.
  2. In the New Schedule dialog, select the element category for which you want to schedule keys.
  3. Select Schedule keys. …
  4. Click OK.
  5. In the Schedule Properties dialog, add the predefined fields for the style. …
  6. Click OK.
IT IS INTERESTING:  Quick Answer: Can PDF contain SVG?

You can include elements from linked models in schedules of model elements (such as walls, floors, and roofs) and in drawing lists. They are not supported for note blocks, view lists, or key schedules.

How do you add a schedule in Revit?

Help

  1. Click View tab Create panel Schedules drop-down Schedule/Quantities.
  2. In the New Schedule dialog, select the element category for which you want to schedule keys.
  3. Select Schedule keys. …
  4. Click OK.
  5. In the Schedule Properties dialog, add the predefined fields for the style. …
  6. Click OK.

How do I Export a schedule from Revit to excel?

The option to export a schedule in File Menu > Export > Reports > Schedule is grayed out when an electrical panel schedule is the active view.

How do I Export a Revit 2020 schedule to excel?

How to Export Revit Schedules to Excel

  1. Open the schedule you want to export.
  2. Go to File -> Export -> Reports -> Schedules.
  3. Choose a location and name to save the text file.
  4. On the next window go with the default options making note of the delimiter setting.

How do I extract data from Revit?

Export Revit Data to a Database

  1. On the Link Revit Model with Database dialog, select MS Access.
  2. Select a recently used connection, or click Select a new connection to create a new connection. If you selected Select a new connection, the Select database dialog displays. Browse to the desired location. …
  3. Click Export.

What is Schedule keys Revit?

You define keys using key schedules. Key schedules look very similar to component schedules, except that you define them to your specifications. When you create a key, it is listed as an instance property for the element. When you apply a value for the key, then the key’s attributes are applied to the element.

IT IS INTERESTING:  You asked: How do I create a layout template in AutoCAD?

How do I create a column schedule in Revit?

To create the schedule, open the Schedules menu on the View tab and select the Graphical Column Schedule tool. After the schedule is generated, you can modify its attributes in the Properties palette.

How do I apply a template to an existing project in Revit?

Solution:

  1. Open the Revit project file (RVT). …
  2. Save As a template file (.rte)
  3. Remove items from the template that will not be re-used on all/most new projects.
  4. Place in your designated template directory.
  5. Set Starting view.
  6. In Revit Options>File Locations>Project template files, promote new template to the top if desired.