Quick Answer: Can you hide rows in Revit schedule?

How do I hide a column in a schedule in Revit?

Hiding Schedule Columns

  1. Open a schedule view.
  2. Click in a row of the column to hide.
  3. Click Modify element tab Columns panel (Hide Columns).

Can you move rows in Revit schedule?

select one or more rows in the title section, then click (Resize Row) and specify a value in the dialog. select cells, then select (Resize Column) and specify a value in the dialog.

How do you add a blank row to a schedule in Revit?

select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule.

How do you shade a schedule in Revit?

To use this great new feature, select and open a schedule within your Revit project. Go to properties, scroll down until you see appearance and click to open. Once open, place a tick in Stripe Rows (1), then select the open box (2) to open the colour palette. Choose the colour required, then OK and close.

How do you rotate a schedule in Revit?

Rotate a Revision Schedule

  1. Open the title block for editing.
  2. In the drawing area, select the revision schedule of the title block. …
  3. On the Options Bar, for Rotation on Sheet, select the desired rotation option.
  4. Reposition the rotated revision schedule on the title block, if needed.
IT IS INTERESTING:  How many numbers of sweep options are there in Catia V5?

How do you split a schedule in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again.
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first segment.

Why can’t I edit schedule in Revit?

issue: Some schedule fields in Revit are not editable. Cause: In some instances, schedules created in Revit and viewed in Revit will not be editable. Schedules will be shown correctly, but the column containing the column containing the combined parameter will not be able to be edited.

How do I delete a schedule in Revit?

Remove from the Project

  1. Right-Click the schedule segment form the Project Browser.
  2. Select Delete.

How do I add a row to an index in Revit?

You can add new rows in a Sheet List to create placeholder sheets. Open a sheet list schedule. On the Modify Schedule/Quantities tab, you can add or delete sheets, or filter unused placeholder sheets. Click Modify Schedule/Quantities tab Rows panel (Insert Data Row).

Special Project