Issue: AutoCAD 2D drawings are commonly drawn in model space at a 1:1 scale (full-size). In other words, a 12-foot wall is drawn at that size. The drawings are then plotted or printed at a plot “scale” that accurately resizes the model objects to fit on paper at a given scale such as 1/8″ = 1′.

How do you copy a view in Revit?

To duplicate a view, right-click the view title in the Project Browser. The 3 duplicate options are listed. When you select the “duplicate” option, an exact duplicate of the view is created, without the annotation and detailing items. With duplicate, only the model geometry of the view is included.

How do I copy a 3D view from one Revit file to another?

Open the same plan view in both projects. Right click on the 1st project’s project browser the 3D view you want to copy -> Select Show camera -> Press Ctrl + C (Copy) being on the 1st project plan view .> Go to the 2nd Project same plan view -> Go to Paste Alligned to view.

What is far clipping in Revit?

You can cut an elevation, section, or callout view at the far clip plane. You activate this feature using the Far Clipping parameter for the view. The far clip plane is defined with the Far Clip Offset parameter. … The Far Clipping parameter is available for elevation, section, and callout views.

IT IS INTERESTING:  What is unique about design bid build?

What does duplicate as dependent mean in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

Can Revit not duplicate existing views?

Go to View > Plans Views > Floor plan. Uncheck “Do not duplicate existing views”. Select the same Level from step one. Select OK.

How do I copy a group from one Revit file to another?

There are several methods for copying from one project to another:

  1. Open both files in the same session of revit. Then simply copy/paste from one to the other.
  2. Create a group of the objects to be copied. Save the group to a file. …
  3. Link the model with objects to be copied into the main model. Then simply bind the link.