How do I view schedules in Revit?

How do I manage a schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

How do Revit schedules work?

A schedule is a tabular display of information, extracted from the properties of the elements in a project. A schedule can list every instance of the type of element you are scheduling, or it can collapse multiple instances onto a single row, based on the schedule’s grouping criteria.

How do I copy a Revit schedule?

Duplicate a Schedule

  1. Right-Click the schedule name in the Project Browser.
  2. In the context menu select Duplicate. Note: If the schedule has been split across sheets into segments, an additional selection will be available, Duplicate with Segments. This will duplicate the schedule and retain the segments created.

Why can’t I edit schedule in Revit?

issue: Some schedule fields in Revit are not editable. Cause: In some instances, schedules created in Revit and viewed in Revit will not be editable. Schedules will be shown correctly, but the column containing the column containing the combined parameter will not be able to be edited.

IT IS INTERESTING:  How do you draw a curved pipe in Civil 3d?

How do I add rows to a Revit schedule?

select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule. Enter values as desired.



Modify a Schedule

  1. To edit a cell, click in it. …
  2. To select a column, click a column index (the alphabetical cells between the title and header).

How do I merge rows in a Revit schedule?

select one or more rows in the title section, then click (Resize Row) and specify a value in the dialog. select cells in one or more rows and click (Delete Row). select header cells to be merged and click (Merge). Select merged cells and click (Merge) again to separate merged cells.

How do I transfer a panel schedule template in Revit?

Firstly, create your schedule as normal. Then right click on the schedule in the project browser, and select save to new file. Give your schedule template a name and choose a location to save it in. Then in your new project go to Insert Tab > Import Panel > Insert from File> Insert Views from File.

How do I export a Revit schedule to excel?

How to Export Revit Schedules to Excel

  1. Open the schedule you want to export.
  2. Go to File -> Export -> Reports -> Schedules.
  3. Choose a location and name to save the text file.
  4. On the next window go with the default options making note of the delimiter setting.

How do I change a schedule name in Revit?

What you really need to do is click on the header of the schedule as if you’re going to rename it, select Clear Cell and type in whatever you want.

IT IS INTERESTING:  Does solidworks work on Mac?

How do you unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

How do you add text to a schedule in Revit?

In the drawing, select a panel. On the Properties palette, under Electrical Engineering, for Schedule Header/Footer Notes click Edit. In the Edit Text dialog, enter the note, and click OK.