How do I save a schedule in Revit?

How do I export a Revit schedule from 2021 to excel?

Solution:

  1. Go to the Application menu (big R in top left) or the File menu in Revit 2018 and later releases.
  2. Select Export.
  3. Scroll down the list until you come to Reports > Schedule.
  4. This will then export a *. txt file.
  5. Import this *. txt file into Microsoft Excel.

How do I copy a Revit schedule to Revit?

Solution:

  1. Open both projects in the same window of Revit.
  2. In the first project, right click on the name of the schedule you want to copy, and choose “Copy to Clipboard”
  3. In the target project, use the Paste command on the Manage ribbon, or type CTRL+V to paste the schedule into the project.

How do I import a schedule into Revit?

Use a Schedule in Another Model

  1. Click Insert tab Import panel Insert from File drop-down Insert Views from File.
  2. Select a Revit project that contains the views to insert, and click Open. …
  3. Select the views to display from the list.
  4. Check the views you would like to insert, and click OK.

How do I create a scheduled template in Revit?

Apply a template to panel schedules

  1. Click Manage tab Settings Panel Panel Schedule Templates Manage Templates.
  2. In the Manage Panel Schedule Templates dialog, click the Apply Templates tab.
  3. Specify a template type to filter the list of existing panel schedules.
  4. Specify a panel configuration.
  5. Select the panel schedule(s).
IT IS INTERESTING:  You asked: How do you delete a joint in Solidworks?

How do I Export a schedule from Revit to excel?

The option to export a schedule in File Menu > Export > Reports > Schedule is grayed out when an electrical panel schedule is the active view.

You can include elements from linked models in schedules of model elements (such as walls, floors, and roofs) and in drawing lists. They are not supported for note blocks, view lists, or key schedules.

In what views will detail lines show in a model?

Detail lines are visible only in the view in which they are drawn. Often they are drawn over the model view. You can convert detail lines to model lines.

How do I transfer a panel schedule template in Revit?

Schedules can be modified using Edit Panel Schedules under the Manage tab. These can then be imported using “Transfer Project Standards”. This will import them to your active project from any other open project.

Special Project