How do I hide project base point in Revit?

How do I unhide a project base point in Revit?

To see the base point in your revit model, open a site plan and then the visibility graphics window. Expand the Site Category, then make sure the Project Base Point is set to visible.

How do I show project base point in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

How do I turn off survey points in Revit?

Look under the Site Category in VGO. Untick Project Base Point and Survey Point.

What is Startup point in Revit?

The internal origin is also called the startup location. When you create a new model, by default the project base point and the survey point are placed at the internal origin . To see them, open the site plan view, or make them visible in another view.

How do I relocate a project in Revit?

Relocate the Model

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). The Relocate Project tool works similar to the Move tool. As you move the cursor over elements, valid references are highlighted and identified in the status bar.
  2. Move the project graphically in the view.
IT IS INTERESTING:  Your question: How do you design building construction?

What is survey point and project base point in Revit?

Project Base Points and Survey Points. Every project has a project base point and a survey point , although they might not be visible in all views, because of visibility settings and view clippings. They cannot be deleted. The project base point defines the origin (0,0,0) of the project coordinate system.

How do you hide an internal origin in Revit?

To hide internal origin in the views, use one of the following options

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. Click Browse to folder and select the local folder with the Dynamo script.
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

What is Project Base point?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. Initially, in stock templates, it identifies the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site.

How do you remove coordinates in Revit?

Remove all shared coordinates and relationships in the host model. Open the host model whose coordinates you want to reset. Click Manage tab Project Location panel Coordinates drop-down (Reset Shared Coordinates). Click to close the message indicating the shared coordinates have been reset.

Special Project