How do I edit a field in Revit?

How do you create a field in Revit?

click (New Parameter), and select whether to add a project parameter or shared parameter. select the field, and click (Edit Parameter). In the Parameter Properties dialog, enter a new name for the field. Click (Delete Parameter) to delete a custom field.

How do I edit type in Revit?

Edit Model Text

  1. In the drawing area, select the model text.
  2. Click Modify | Generic Models tab Text panel Edit Text.
  3. In the Edit Text dialog, change the text as desired.
  4. Click OK.

Why can’t I edit schedule in Revit?

issue: Some schedule fields in Revit are not editable. Cause: In some instances, schedules created in Revit and viewed in Revit will not be editable. Schedules will be shown correctly, but the column containing the column containing the combined parameter will not be able to be edited.

How do you add a family in Revit?

Load Families

  1. Click Insert tab Load from Library panel (Load Family).
  2. In the Load Family dialog, double-click the category of the family that you want to load.
  3. Preview any of the families (RFA) in the category: To preview a single family, select it from the list. …
  4. Select the family that you want to load, and click Open.
IT IS INTERESTING:  Frequent question: What are the advantages of using AutoCAD?

How do you add a structural column in Revit?

User’s Guide: Placing a Vertical Structural Column. Click Structure tab Structure panel Column drop-down Structural Column. Click Modify | Place Structural Column tab Placement panel Vertical Column. If a structural column family has not been previously loaded, Revit Architecture prompts you to load one.

How do I edit text in a schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

How do I edit a sheet index in Revit?

In the Project Browser, under Schedules/Quantities, click the sheet list name. On the Properties palette, for Fields, click Edit.



Use the Sheet Order field to sort the sheet list, as follows:

  1. Click the Sorting/Grouping tab.
  2. For Sort by, select Sheet Order. Make sure that Ascending is selected.
  3. Click OK.

How do you apply conditional formatting in Revit?

Go to the Formatting menu of the schedule. Select the Name field and click on Conditional Format… Enter the formula like in the image and select a color override for fields that matches the criteria.

How do you change the text level in Revit?

Solution:

  1. In the Project Browser, expand the Families folder.
  2. Under the Annotation Symbols, find the name of the family that needs to be edited (e.g. Level Head – Circle).
  3. Right click the family, select “Edit” option.
  4. In this family file, click on the “Name” label.
  5. Select “Edit Type”.
IT IS INTERESTING:  Question: How do I change the family template in Revit?

How do I edit text notes?

To edit a text note, select the text note in the drawing area, and then the following options are available. Add a leader. Click Modify | Text Notes tab Leader panel, and select a leader style. Specify an attachment point, drag the leader points as necessary, and then click anywhere in the view to finish editing.

How do you move text in Revit?

Move Model Text

  1. In the drawing area, select the model text.
  2. Drag the model text to a new location.

How do you add text to a schedule in Revit?

In the drawing, select a panel. On the Properties palette, under Electrical Engineering, for Schedule Header/Footer Notes click Edit. In the Edit Text dialog, enter the note, and click OK.

How do you crop a schedule in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again. …
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.
Special Project