How do I change parent view in Revit?

The Parent View parameter is not changeable in Revit. Once you create a callout view on a view, thats it. You can however copy the callout view to your clipboard, and paste it to the same place on another view. Now copy all your annotations to the clipboard, and paste it into the “new” callout.

How do you create a parent view in Revit?

Create dependent views from the Project Browser.

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.

What is a dependent view Revit?

Make multiple copies of a view that are dependent on the primary view. All copies, known as dependent views, remain synchronous with the primary view and all other dependent views, so that when view-specific changes (such as view scale and annotations) are made in one view, they are reflected in all views.

How do you change floor view in Revit?

Add another view to your project or duplicate an existing view.

  1. Click View tab Create panel Plan Views drop-down, and then click. (Floor Plan) …
  2. In the New Plan dialog: For Type, select a view type from the list, or click Edit Type to modify an existing view type or create a new view type. …
  3. Click OK.
IT IS INTERESTING:  How do you create a parameter in Fusion 360?

Are callouts view specific in Revit?

A reference callout is a callout that refers to an existing view. When you add a reference callout, Revit does not create a view in the project. Instead, it creates a pointer to a specified, existing view. You can place reference callouts in plan, elevation, section, callout, and drafting views.

What does duplicate as dependent mean in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

How do you hide a callout in Revit?

Click View tab Graphics panel (Visibility/Graphics). On the Annotation Categories tab, under Visibility, make sure that Callouts is selected. (To hide all callout tags in the view, clear this option.)

How do you create a Matchline in Revit?

Add a Matchline

  1. Open the primary view from which your dependent views were created.
  2. If crop regions are not visible, click (Show Crop Region) on the View Control Bar. …
  3. Click View tab Sheet Composition panel (Matchline).
  4. Sketch the matchline.
  5. When finished, click Finish Matchline.

How do I add levels in Revit 2020?

Add Levels

  1. Open the section or elevation view to add levels to.
  2. On the ribbon, click (Level). Architecture tab Datum panel (Level)
  3. Place the cursor in the drawing area and click. …
  4. Draw level lines by moving the cursor horizontally. …
  5. Click when the level line is the correct length.

How do you select a floor in plan view Revit?

In a plan view, select the floor, and click Modify | Floors tab Mode panel Edit Boundary. Watch the tooltip and the status bar to be sure you select the floor, not another element. If desired, you can use a filter to select the floor. See Selecting Elements Using a Filter.

IT IS INTERESTING:  How do I show groups in AutoCAD?

What is the purpose of callouts in Revit?

The callout view shows an enlarged version of part of the parent view, and provides more information or details about that part of the building model. You can add a detail callout or a view callout to a plan, section, detail, or elevation view. When you draw the callout bubble in a view, Revit creates a callout view.

What is a Revit callout?

When you draw the callout bubble in a view, Revit Architecture creates a callout view. You can then add details to the callout view to provide more information about that part of the building model. NoteTo create a reference callout, see Creating a Reference Callout. In a project, click View tab Create panel (Callout).

How do you reference a view in Revit?

Reference sections can reference section views, callouts of section views, and drafting views. To create a reference section: Click View tab Create panel (Section). On the Options Bar, select Reference other view, and select a section, callout of a section, or drafting view name from the drop-down menu next to it.