How do I add a variable in Solidworks?

How do you show variables in Solidworks?

Click Equations. (Tools toolbar). Click Tools > Equations. Right-click the Equations.



The SOLIDWORKS software does the following:

  1. Encloses the name in quotation marks.
  2. Moves the cursor to the Value/Equations column and inserts = (equal sign).
  3. Displays a flyout menu with options for starting the global variable.

How do I show a global variable in Solidworks?

Another way is to double click on a dimension and, in the dimension field, type = followed by the variable name; the text will turn gold and there will be a globe icon that pops up. This lets you know SOLIDWORKS is going to create a global variable.

Linking Dimension Values Using Link Values

  1. Right-click the dimension and select Link Values.
  2. In the Shared Values dialog box, select or type a Name. In addition to the linked variable names you create, global variables are also available for selection under Name. …
  3. Click OK. …
  4. Repeat for as many dimensions as needed.

How do you add Equations in Solidworks assembly?

You can add an equation to a part or assembly using the Equation View, Dimension View, or Ordered View.



Adding an Equation

  1. Click Equations. (Tools toolbar).
  2. Click Tools > Equations.
  3. Right-click the Equations. folder in the FeatureManager design tree, and select Manage Equations.
IT IS INTERESTING:  Your question: What happens if you build without planning permission?

Where are global variables stored in Solidworks?

Global variables and their current values appear: In the Equations dialog box. In the Equations folder. in the FeatureManager design tree.

How do I create a parameter in Solidworks?

To define parameters in the SOLIDWORKS model:

  1. In the FeatureManager Design Tree, right-click Equations and click Add/Edit Parameters.
  2. In the Parameters dialog box, enter a name for the parameter.
  3. Optional: To define a parameter for a model dimension, select a driving dimension in the graphics area.

What are linked values?

Use linked values (also referred to as shared values or linked dimensions) to link two or more dimensions without using equations or relations. When dimensions are linked in this way, any member of the group can be used as a driving dimension.

How do you do equations in Solidworks?

Adding a Sketch Equation

  1. Click Equations. (Tools toolbar).
  2. Click Tools > Equations.
  3. Right-click the Equations. folder in the FeatureManager design tree, and select Manage Equations.

How do I create a dependent dimension in Solidworks?

Double click the dimension, then in the Modify dialog box, type = (equal sign) and several characters of the global variable name. A flyout menu appears with a name that matches the characters you have typed. Both dimensions become linked to the global variable. Repeat for as many dimensions as needed.

How do you use the equation driven curve in Solidworks?

To create an equation driven curve: On the Sketch toolbar, click the Spline flyout, and then select Equation Driven Curve or click Tools > Sketch Entities > Equation Driven Curve . Under Equation Type, select Explicit or Parametric. 3D sketches support parametric equations only.

IT IS INTERESTING:  What is rhino surety bond?

What are the functions of Solidworks?

SOLIDWORKS CAPABILITIES

  • 3D Solid Modelling.
  • Direct Part Editing.
  • Large Assembly Design.
  • Assembly Mechanisms.
  • Complex Shapes.
  • Sheet Metal Fabrications.
  • Welded Structures.
  • Plastic & Cast Part Design.

Linking Dimension Values Using Link Values

  1. Right-click the dimension and select Link Values.
  2. In the Shared Values dialog box, select or type a Name. In addition to the linked variable names you create, global variables are also available for selection under Name. …
  3. Click OK. …
  4. Repeat for as many dimensions as needed.
Special Project