How do you manage scope boxes in Revit?

In a plan view, click View tab Create panel (Scope Box). On the Options Bar, enter a name and specify a height for the scope box, if desired. Tip: You can also change the name of the scope box after creating it. Select the scope box, and on the Properties palette, enter a value for the Name property.

How do you schedule areas in Revit?

On the Fields tab of the Schedule Properties dialog, do the following:

  1. For Scheduled fields (in order), add the following fields: Usage. Level. …
  2. Click Calculated Value.
  3. In the Calculated Value dialog, for Name, enter Floor Area %.
  4. Select Percentage.
  5. For Of, select Floor Area.
  6. For By, select Grand total.
  7. Click OK twice.

What is the use of Scope box in Revit?

Use scope boxes to control the extents of datum elements and cropping of views. Scope boxes make views more consistent and clean throughout your project, making it easier for you to control a view by adjusting the boundary of a scope box.

Which element can a scope box can control?

Scope boxes control the visibility of datum elements in views whose cutting plane intersects the scope box. Scope boxes are particularly useful to control the visibility of datums that are not parallel or orthogonal to a view.

IT IS INTERESTING:  Is nanoCAD better than AutoCAD?

Which elements can a scope box can control select all that apply?

Scope boxes are used to control the extents of elements like grids, levels and reference planes. Each of these elements can be assigned to a specific scope box, limiting the 3D extents to the dashed green line limit.

What is an area schedule?

The Building Schedule of Areas explains the sizes of all the spaces described in the Building Performance Specification. The Building Schedule of Areas is simply a table of the named spaces in the Performance Specification with an estimation of their size.

What is the purpose of a scope box?

Use scope boxes to control the extents of datum elements and cropping of views. Scope boxes make views more consistent and clean throughout your project, making it easier for you to control a view by adjusting the boundary of a scope box.

How do I make my scope box visible?

Click in the text box, and select Visible in the list. Click OK. The scope box is now visible in that view.

How do you propagate extents in Revit?

You can use Propagate Extents to accomplish this. Select the datum. Click Modify | tab Datum panel (Propagate Extents). In the Propagate Datum Extents dialog, select the parallel views in which you want the datum to look the same, and click OK.

How do you create a crop region in Revit?

Create a crop region.

  1. If the view is not cropped, On the View Control Bar, click (Crop View).
  2. If the view is cropped, but the crop region is not visible, click (Show Crop Region) on the View Control Bar.
  3. Resize the crop region as necessary by using the drag control or setting the size explicitly.
IT IS INTERESTING:  How do I make SVG smoother?
Special Project