Quick Answer: How do you do dependent views in Revit?

How do you make a dependent view in Revit?

Create Dependent Views

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.

What is duplicate as dependent in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

What is the difference between duplicate and duplicate with detailing in Revit?

The Duplicate option creates a duplicate view of the model elements within the view. The Duplicate with detailing option creates a duplicate view including the detail and annotations elements. They are independent from elements of the parent view.

IT IS INTERESTING:  Best answer: Can I download AutoCAD?

How do I manage views in Revit?

To create a View Filter you can use Revit’s option in View tab – Visibility Graphics. You can also easily create View Filters with Naviate Color Elements tool. Go to ‘Manage Project’ and ‘View Filter Manager’. You can add or remove view filters from your views or templates.

How do I change parent view in Revit?

The Parent View parameter is not changeable in Revit. Once you create a callout view on a view, thats it. You can however copy the callout view to your clipboard, and paste it to the same place on another view. Now copy all your annotations to the clipboard, and paste it into the “new” callout.

How do you do Matchlines in Revit?

Add a Matchline

  1. Open the primary view from which your dependent views were created.
  2. If crop regions are not visible, click (Show Crop Region) on the View Control Bar. …
  3. Click View tab Sheet Composition panel (Matchline).
  4. Sketch the matchline.
  5. When finished, click Finish Matchline.

How do you duplicate a schedule in Revit?

Duplicate a Schedule

  1. Right-Click the schedule name in the Project Browser.
  2. In the context menu select Duplicate. Note: If the schedule has been split across sheets into segments, an additional selection will be available, Duplicate with Segments. This will duplicate the schedule and retain the segments created.

How do you copy a view in Revit?

Copying Drafting Views & Schedules

  1. Select a drafting view or schedule in the project browser.
  2. Right-click and choose ‘Copy to Clipboard’

How can duplicate with Dependent be used?

Duplicate as Dependent



Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects. What this means is if you add a dimension in the ordinal view all dependent views will also have the new dimension.

IT IS INTERESTING:  What is an architect II?

What would be the best workflow when using massing tools in Revit?

You can create wall, floor, or roof elements by modeling them using the create tools on the Architecture tab or by using the Model by Face tool on the Massing & Site tab. It is typically best to start by converting the mass floors in your conceptual model into Revit building elements.

What is a face based family?

Face-based. Use the face-based template to create work plane-based families that can modify their hosts. Families created from the template can make complex cuts in hosts. Instances of these families can be placed on any surface, regardless of its orientation. See Creating a Work Plane-based Family.

How do you view views in Revit?

To see all open views at once, on the View tab of the Ribbon, click Tile Views. Use the Navigation bar in any of the views to zoom the contents of the current window or all the tiled window to fit. Manually re-position a view by clicking the tab of the view and dragging it to a new position.

What are views in Revit?

Views within Revit fall into three main categories. One is a coordination view, a view used for design purposes and coordination. Views under the Design (Working Views) fall into this category. Another is a documentation view, a view put onto a sheet making up the deliverables of the project.

How do you move views in project Browser?

Sort Views or Sheets in the Project Browser

  1. Click View tab Windows panel User Interface drop-down Browser Organization.
  2. In the Browser Organization dialog, click the Views tab to apply a sort to project views, or click the Sheets tab to apply a sort to sheets.
  3. Select a sort group. …
  4. Click Apply, then click OK.
IT IS INTERESTING:  How do you navigate on a Lumion 9?
Special Project