How do you split a schedule into two sheets in Revit?

How do I resize a schedule in Revit?

The first is the ability to zoom in and out of schedules, which was introduced in Revit 2019.1. Simply hold the CTRL key and move your mouse wheel to zoom in and out of the schedule.

How do you create multiple sheets in Revit?

Create multiple sheets

  1. Select views, where you choose from existing views in your project. …
  2. Select levels, where you choose levels in a list and the application creates new floor plans. …
  3. Specify number of drawings, where you specify the number of copies you want of your template drawing.

How do I split a scheduled sheet in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again.
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first segment.

How do you add a schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

IT IS INTERESTING:  You asked: How do I export BOM from Solidworks?

Can you combine schedules in Revit?

You can combine two or more parameters to display in a single cell of a schedule. The values for the combined parameters are separated by a slash or other character you specify.

How do you add a floor plan to a sheet in Revit?

To add a view to the sheet, use one of the following methods:

  1. In the Project Browser, expand the list of views, locate the view, and drag it onto the sheet.
  2. Click View tab Sheet Composition panel (Place View). In the Views dialog, select a view, and click Add View to Sheet.

What is a sheet in Revit?

A construction document set (also called a drawing set or a sheet set) consists of several sheets. Topics in this section. About Sheets. In Revit, you create a sheet view for each sheet in the construction document set. You can then place multiple drawings or schedules on each sheet view.

How do you split cells in Revit?

One of the great new features of Revit 2017 is we can now use the Split Tool to split columns, the same as we can split walls, beams, lines etc. To do this, just open a 3D or elevation view, then select the Split Tool on the Modify tab. Next just click the desired column at the location you would like it to split.