How do you move a project base point in Revit?

How do you select a project base point in Revit?

Help

  1. Open the desired view.
  2. Click View tab Graphics panel (Visibility/Graphics).
  3. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it.
  4. To display the project base point, select Project Base Point.
  5. To display the survey point, select Survey Point.

How do you unclip a project base point in Revit 2021?

You cannot delete the project base point. Project North defines the Y axis of the project base point. To ensure that the project base point does not move inadvertently, you can pin it by selecting the point and clicking Modify tab Modify panel (Pin).

How do you change coordinates in Revit?

Enter the context of your task here (optional).

  1. Click Annotate tab Dimension panel (Spot Coordinate).
  2. In the Type Selector, select the type of spot coordinate to place.
  3. On the Options Bar, select or clear Leader. …
  4. If you want the elevation to display in addition to the spot coordinates, do the following:
IT IS INTERESTING:  Question: Can I use AutoCAD LT on two computers?

How do you move a project base point in Revit without moving a building?

Help

  1. In the site plan view or another view that displays the project base point, select the project base point.
  2. Drag the project base point to the desired location. …
  3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).

How do you hide a project base point in Revit?

To temporarily display the project base point and the survey point in a view, on the View Control Bar click (Reveal Hidden Elements).

How do you use project base point?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

How do you move project base point more than 10 miles?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.

dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.
IT IS INTERESTING:  How do I show hidden lines in AutoCAD?

What is the method to georeference a Revit file?

Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.

How do I set shared coordinates in Revit?

To establish a common coordinate position and then share that position between files, use the Acquire Coordinates tool or the Publish Coordinates tool. Tip: You should derive shared coordinates from only one file. That one file defines the coordinates for all other files that compose the project.

How do you move a level tag in Revit?

Select and move the end drag control near the bubble to resize the level line. Click the Add Elbow drag control ( ), then drag the control to the desired location to move the bubble away from the level line.

How do you specify coordinates?

Relative Coordinates. To specify absolute Cartesian coordinates: Enter a command requiring coordinates, for example Line. Specify the X, Y- and Z-coordinates separated by commas, for example 0,0,0.