How do you duplicate multiple views in Revit?

How do you copy multiple views in Revit?

It’s real easy to duplicate views in Revit. Simply select the view in the project browser, right-click and choose “Duplicate View” from the list.

How do you duplicate a view?

Create a copy of a view

  1. Sign in to Google Analytics..
  2. Click Admin, and navigate to the view you want to copy.
  3. In the VIEW column, click View Settings.
  4. Click Copy view.
  5. Give this a new view name. Use a distinct name, so you can distinguish it from the original view.
  6. Click Copy View.

How do you duplicate a dependent view in Revit?

Create Dependent Views

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.

What does duplicate view as dependent mean in Revit?

Duplicate as Dependent



Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects. What this means is if you add a dimension in the ordinal view all dependent views will also have the new dimension.

IT IS INTERESTING:  Where do I get my house blueprints?

How do you duplicate a page in Revit?

Duplicate a Sheet

  1. Open the project.
  2. Select a sheet in the Project Browser.
  3. Right Click, click Duplicate Sheet and select one of the options, as follows: Duplicate Empty Sheet – A new sheet is created with only the titleblock, information, and any project/shared parameters used by the titleblock.

How do you duplicate a project in Revit?

Click Manage tab Design Options panel (Design Options). In the Design Options dialog, select the design option from the list. Under Option, click Duplicate. Revit creates a copy of the selected design option named Copy of .

What does duplicate mean in Revit?

Duplicate creates a duplicate view with no annotations. ( doesn’t copy annotations) Duplicate with detailing creates a duplicate view including the annotations. The annotation after the “create” are independent of each other. ( Copies annotations, but doesn’t reflect new annotations to copied from view)

How do you duplicate a floor in Revit?

Solution:

  1. Copy to Clipboard (CTRL+C) or from the Modify ribbon>Clipboard panel, choose Copy.
  2. On the Modify ribbon > Clipboard, click the drop down arrow under the Paste command.
  3. Select “Aligned to Selected Levels”
  4. Choose the Target level (i.e. Level 2)
  5. Switch to a 3D View to see the results.

What is the difference between duplicate and duplicate with detailing in Revit?

The Duplicate option creates a duplicate view of the model elements within the view. The Duplicate with detailing option creates a duplicate view including the detail and annotations elements. They are independent from elements of the parent view.

How do you create a dependent view?

Create Dependent Views

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.
IT IS INTERESTING:  Which command would you use to change the scale of an object in AutoCAD?

How do you make a view independent in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

How do you add a loaded family in Revit?

Load Families

  1. Click Insert tab Load from Library panel (Load Family).
  2. In the Load Family dialog, double-click the category of the family that you want to load.
  3. Preview any of the families (RFA) in the category: To preview a single family, select it from the list. …
  4. Select the family that you want to load, and click Open.

How do design options work in Revit?

On the Manage tab within Revit, select the Design Option button. Select the New button under Design Option Set to create a new option set called “Option Set 1”. The first option will be automatically created and will be called “Option 1 (primary).

How do I use a scope box in Revit?

Create a Scope Box

  1. In a plan view, click View tab Create panel (Scope Box).
  2. On the Options Bar, enter a name and specify a height for the scope box, if desired. …
  3. To draw a scope box, click in the upper left-hand corner to start the box.
Special Project