How do you control a view range in Revit?

How do you use the view range in Revit?

To modify the view range:

  1. Open a plan view.
  2. Click View tab -> Graphics panel -> View Properties.
  3. In the Instance Properties dialog, locate the View Range parameter, and click Edit.
  4. In the View Range dialog, modify view range properties as necessary.

What is view range?

The view range is a set of horizontal planes that control object visibility and display in the view. The horizontal planes are Top, Cut Plane, and Bottom. The top and bottom clip planes represent the topmost and bottommost portion of the view range.

Why is my view range greyed out in Revit?

In your case you seem to have a view template assigned to your view. This (can) cause different settings to be grayed out because it is controlled by the view template. You can solve it by removing the view template from the view (set it to )or modify the view template.

Why can I see the level below in Revit?

Solution: To prevent the floor or slab from being visible in plan view, you need to adjust the bottom clip so that it is more than 4 feet above the floor or slab and set the view depth so that it does not include any part of the floor or slab. Follow these steps: In plan view, click View menu > View Properties.

IT IS INTERESTING:  Your question: How do I make G codes in AutoCAD?

What is Revit plan view?

The structural plan view is the default view when you start a new project using a structural template. … You can create multiple structural plan view types. Engineers view plans at different orientations in different countries. Revit provides for this variation with the View Direction type parameter for structural plans.

How do I change the view in Revit?

Modify a View on a Sheet

  1. Open the sheet.
  2. In the drawing area, select a view on the sheet. …
  3. Click Modify | Viewports tab Viewport panel (Activate View). …
  4. Modify the view as desired. …
  5. To deactivate the view on the sheet, double-click outside of the view, or right-click, and click Deactivate View.

Can you change the associated level of a view in Revit?

Existing views do not re-associate themselves to another Level, ever, for any reason. Their relationship is permanent. It’s a fundamental aspect of Revit and very unlikely to change.

How do I turn on underlay in Revit?

Create an Underlay

  1. In the Project Browser, open a plan view.
  2. On the Properties palette, for Range: Base Level, select the level you want to underlay. Range: Top Level is automatically set to one level above the Base Level. …
  3. On the Properties palette, for Underlay Orientation, select Look Up or Look Down.

How do you show floor level in Revit?

Go to Solution. Change the View Properties to None for Underlays or the View Range if it has been changed to show the Bottom Primary depth or View Depth below the current view floor level. Reight-Click in the view and select View Properties or type in VP. worked.

IT IS INTERESTING:  How do I get rid of background shadows in Solidworks?
Special Project