How do I edit a schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

How do I edit an existing schedule in Revit?

Help

  1. Open the schedule (double-click its name in the Project Browser or click its tab).
  2. To make changes to the schedule, see the following table for instructions. Use the following guidelines: To edit a cell, click in it. You can select a value from a list, if available, or enter text.

How do I edit a schedule?

To edit a schedule:

  1. Click Schedules, then choose a schedule from the list.
  2. Click. …
  3. Make changes to each page that you want, and click Next.
  4. Click Finish in the Schedule assistant to save changes.
  5. If necessary, select Enabled next to the schedule so that it will run.

How do I add a column to a schedule in Revit?

Add Column Totals to a Schedule

  1. In the Project Browser, select the schedule name.
  2. On the Properties palette, for Formatting, click Edit.
  3. Select the field to add a column total for, and select Calculate Totals. …
  4. Click OK.
IT IS INTERESTING:  Best answer: Is SketchUp available for Mac?

How do I make a Revit schedule smaller?

Click on the schedule in the sheet view and the Resize button will appear on the Modify Schedule Graphics Tab.

How do I change the color of a schedule in Revit?

On the Appearance tab of the Schedule Properties dialog, define the default title, header, and data font styles by selecting system text types. We will also add striped rows to the table making it easier to read. Use the drop down to select which row to stripe, and then select the color for the striping.

How do you merge cells in Revit schedule?

select one or more rows in the title section, then click (Resize Row) and specify a value in the dialog. select cells in one or more rows and click (Delete Row). select header cells to be merged and click (Merge). Select merged cells and click (Merge) again to separate merged cells.

Under which menu schedules can be created in Revit?

In your Revit project go to the “View” tab located on the ribbon bar. 2. In the section “Create” find “Schedules” and click on “View List” at the bottom of the drop down menu.

How do you unsplit a schedule in Revit?

Join Split Schedules on Sheets

  1. On a sheet that displays a split schedule, select the schedule. Use the 4-way arrow control to drag one schedule section over the other section.
  2. Release the mouse button. The split schedule sections rejoin into one section.

How do I group a row in a schedule in Revit?

Group Column Headings in a Schedule

  1. Open a schedule view.
  2. In the group header rows, drag the cursor across the headings to group. …
  3. Click Modify Schedule/Quantities tab Headers panel Group, or right-click the selected headings, and click Group Headers. …
  4. Enter text in the new row as necessary.
IT IS INTERESTING:  How do I export a STEP file in Rhino?

Why is insert data row greyed out Revit?

There are two settings that will disable the Insert Data Row tool (using Revit 2016 at the moment). … If we don’t check the Itemize every instance option on the Sorting/Grouping tab the Insert Data Row is disabled. The other culprit is using the Embedded Schedule feature.