You asked: How do you match a project base point in Revit?

How do you match coordinates in Revit?

Relocate the Model by Specifying Coordinates

  1. Optional: Display the project base point and the survey point in the current view.
  2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
  3. Place the cursor on a reference point of the model. …
  4. Click the reference.

How do I find the base point of a project in Revit?

Click View tab Graphics panel (Visibility/Graphics). On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point.

How do you set a project base point in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. Drag the project base point to the desired location.

How do you unlock visibility graphics in Revit?

The Visibility/Graphics window will be greyed out (as shown above) if its included in the View Properties of the View Template. So make sure you go into the View Template and update the Visibility/Graphics or change settings to not included Visibility/Graphics.

IT IS INTERESTING:  What is break line in AutoCAD?

How do you move project base point more than 10 miles?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.

How do you hide a coordinate system in Revit?

To hide internal origin in the views, use one of the following options

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. Click Browse to folder and select the local folder with the Dynamo script.
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

What is Project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. … When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.

How do I hide a project in origin Revit?

To hide internal origin in the views, use one of the following options

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. Click Browse to folder and select the local folder with the Dynamo script.
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

IT IS INTERESTING:  Which app is best for AutoCAD?

How do I reset a project base point in Revit?

If you later want to return the project base point to its startup location, do the following:

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.
Special Project