You asked: How do I change a schedule in keynote Revit?

How do you update a keynote schedule in Revit?

After the keynote file changes have been made and the file saved you can update the file by reselecting it within the Revit application. From the Settings menu select Keynoting and Browse to the keynote file location. Select the file that needs to be refreshed then pick open and okay. The file should refresh.

Solution:

  1. Upload each Keynote file to BIM 360.
  2. In Revit navigate to the Annotate tab.
  3. Select Keynote Settings.
  4. Switch File path to Absolute or Relative.
  5. Select Browse > My Computer > BIM 360.
  6. Navigate through company > Project > Project Files > Subfolder location.

How do you reload a keynote file in Revit?

Click Reload to load the keynote table, or click browse to select a different keynote table. Opens the Browse for Keynote File dialog. Navigate to the keynote file to use, and click Open to load the keynote file. Keynote files can be stored on local or remote servers.

How do you edit keynote in Revit?

To change the keynote value of an element, select the element and click Edit Type on the Properties palette. Click the keynote value to open the Keynotes dialog and select a new keynote.

IT IS INTERESTING:  Is it OK to uninstall Autodesk 360?

How do you schedule generic annotations in Revit?

Click View tab Create panel Schedules drop-down Note Block. In the New Note Block dialog, for Family, select a generic annotation. For Note Block Name, enter a name for the new note block, if desired. Click OK.

What are keynotes in Revit?

A keynote parameter is available for all model elements (including detail components) and materials. You can tag each of these elements using a keynote tag family. The keynote value is derived from a separate text file that contains a list of keynotes.

What is Revit keynote manager?

Revit’s keynote system is a powerful way to integrate data into Revit families, reduce errors, and streamline documentation. The text files, though, are cumbersome and difficult to work with. Keynote Manager was created to provide a simple, efficient interface to edit keynote files.

How do I reload a Keynote file?

About Loading or Reloading Keynotes

  1. Open the Keynoting Settings dialog box and click the Reload button. Once this is done, you’ll need to use Synchronize With Central (if the project is workshared), and your team members will also need to use SW C to gain access to the changes.
  2. Close and reopen your project file.