Quick Answer: Can you move project base point Revit?

How do I move a base point over 10 miles in Revit?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.

How do you move project base point to internal origin?

To establish the project coordinate system, move the project base point away from the internal origin to another location, such as the corner of a building. If you later want to return the project base point to the internal origin, unclip the project base point, right-click it, and click Move to Startup Location.

How do I reset a project base point in Revit?

If you later want to return the project base point to its startup location, do the following:

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.
IT IS INTERESTING:  How do I turn off data collection in Autocad?

How do you move project base point?

Move the project base point to the internal origin

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.

What is survey point and project base point in Revit?

Project Base Points and Survey Points. Every project has a project base point and a survey point , although they might not be visible in all views, because of visibility settings and view clippings. They cannot be deleted. The project base point defines the origin (0,0,0) of the project coordinate system.

How do I relocate a project in Revit?

Relocate the Model

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). The Relocate Project tool works similar to the Move tool. As you move the cursor over elements, valid references are highlighted and identified in the status bar.
  2. Move the project graphically in the view.

How do you align a project base point in Revit?

Auto – Project Base Point to Project Base Point



If the host model’s project base point changes, the linked model does not reflect the change. To reposition the linked model, select it, right-click, and click Reposition to Project Base Point.

How do you move a whole building in Revit?

Relocate a Project

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). You use the tool just like the Move tool.
  2. Move the project graphically in the view.. Note: If you have set levels or spot elevations to report values from the shared origin, their values update.
IT IS INTERESTING:  How do I convert a KMZ file to AutoCAD?

How do I change the elevation of a project in Revit?

Manage tab> Project Location> Coordinates> Specify Coordinates at Point:

  1. Select the ground level line and specify elevation:
  2. Ground level still says 0. Select the ground level line and change the type to Shared Datum:
  3. Ground level now shows the Shared Datum levels:

How do I reset Revit 2020 to default settings?

Go to the Start menu > all Programs > Autodesk > expand your software folder and then click on “Reset Settings to default”. Select “Reset custom settings” and this will reset the software and launch.

How do you change coordinates in Revit?

Click on the Manage Tab > Coordinates > Specify Coordinates at a Point. Click on the model line at the known origin point. The Specify Shared Coordinate dialog will open. Enter the coordinate values, the correct datum (Elevation) and the angle to True North.

How do you reset coordinates in Revit 2020?

Once the . dwg file has been successfully loaded, coordinates may be acquired from this file to “Reset” the internal coordinates. To accomplish this go to the Manage tab>>Project Location panel>>Coordinates drop Down Acquire Coordinates.