Question: How do I move a linked file in Revit?

Where are Revit linked files?

Whenever you open a project that is linked to a file, Revit retrieves the current saved version of the linked file. The path to the linked file displays in the Saved Path column of the Manage Links dialog.

How do you copy a linked element in Revit?

Copy Elements from a Linked Model

  1. In the drawing area of a view of the host model, move the cursor over the element in the linked model.
  2. Press Tab until the element to copy is highlighted, and click to select it.
  3. Click Modify | RVT Links tab Clipboard panel (Copy to Clipboard).

How do you align linked models in Revit?

If the host model’s project base point changes, the linked model does not reflect the change. To reposition the linked model, select it, right-click, and click Reposition to Project Base Point.

Using Ideate BIMLink, delete a link definition from the current Revit project by selecting the link name in the main dialog and either pick the Delete key on your keyboard or right-click to select the Delete option. You may also use Shift+Select to select multiple links for deletion.

IT IS INTERESTING:  How do you rotate an elevation view in Revit?

How do you override a graphic linked model in Revit?

Visbility/Graphic Overrides

  1. Open the Visibility/Graphic Overrides dialog (View tab > Visibility/Graphics, or type “VG” or “VV”).
  2. Navigate to the Revit Links tab.
  3. Under Display Settings for the linked file, click By Host View.

How do I pin a linked model?

It is much too easy to accidentally select a linked model in Revit MEP and accidentally move it, so the link should be “pinned” in place so that people don’t move it on accident. To accomplish this select the link file and from the Modify RVT Links ribbon click the pin button.

Can I copy and paste between Revit models?

How can I copy and paste geometry from one file into another? Go to the file you want to copy from, highlight the objects to copy and type “Ctrl-C” (that is, hold down the Ctrl key and type “C”). Then open the file you want to paste that element into and type “Ctrl-V.”

How do I copy a family from one project to another?

Ways to Transfer Revit Families from One Project to Another



To start with, open the source project where the required families are. Then, in Project Browser navigate to Families section and right-click on it. Choose Save… then choose a folder to save your families to, and next in Family to save field leave option.

How do you copy and paste in Revit?

Select an element and, while pressing Ctrl , drag the element to copy it. Use the Copy tool to copy elements and place them immediately. Use the clipboard to copy and paste elements with Ctrl+C and Ctrl+V .

IT IS INTERESTING:  How do you change the text color in Revit?

How do you change coordinates in Revit?

Click on the Manage Tab > Coordinates > Specify Coordinates at a Point. Click on the model line at the known origin point. The Specify Shared Coordinate dialog will open. Enter the coordinate values, the correct datum (Elevation) and the angle to True North.