How do you show revision clouds in Revit?

How do you unhide revision clouds in Revit?

The reason that the Revit Revision Box is non editable / greyed out on the sheet is because there is a cloud or series of clouds on the sheet that are not visible. To resolve this, go to the Manage Tab → Additional Settings → Sheet Issues / Revisions.

How do you turn off revision schedule in Revit?

Delete Revisions

  1. Click View tab Sheet Composition panel (Sheet Issues/Revisions).
  2. Click the sequence number for the revision you wish to delete. Optionally, press and hold Ctrl, then click to select multiple sequence numbers to delete.
  3. Click Delete. …
  4. At the confirmation message, click OK. …
  5. Click OK.

How do you add revision to every sheet in Revit?

In the Revision menu, you will find the Set Revisions On Sheet menu. Select the revision you want to add. Then, you will have to select the sheets to which you want to add the specific revision. If you look at the revision schedule inside one of the selected sheets, you will see the selected revision has been added.

How do I change revision info in Revit?

Enter Revision Information

  1. In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions). …
  2. To add a new revision, click Add. …
  3. In the revision row, for Numbering, select Numeric, Alphanumeric, or None.
  4. For Date, enter the date on which the revisions are made or will be sent for review.
IT IS INTERESTING:  How do I download Onshape files as STL?

Can you schedule revision clouds in Revit?

Schedule and add remarks to your Autodesk® Revit® revision clouds with our Revision Cloud Scheduling tool. Using the default Revit revision clouds, this tool can create a schedule and export to Excel so that no revision gets left behind and untracked.

How do I change the revision cloud size in Revit?

Click Modify | Revision Clouds tab Mode panel (Edit Sketch).



  1. In the project, click Manage tab Settings panel (Object Styles).
  2. Click the Annotation Objects tab.
  3. For Revision Clouds, change the values for Line Weight, Line Color, and Line Pattern.
  4. Click OK. These changes apply to all revision clouds in the project.

What is a drawing revision?

The term “Drawing Revision” refers to modifications that are made to a drawing after it has been signed and issued. The first revision to a drawing takes place after the initial issue of the drawing is signed and released for bid or construction.

How do I hide a row in a Revit schedule?

select cells in one or more rows and click (Delete Row). select a cell or column header, then click (Hide Columns). Click (Unhide All Columns) to reveal hidden columns.