How do you set a project base point in Revit?

What is a project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. … When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.

Where is the project base point in Revit?

To see the base point in your revit model, open a site plan and then the visibility graphics window. Expand the Site Category, then make sure the Project Base Point is set to visible. Next select the project base point in the Revit View, and click on the paperclip icon.

How do I reset a project base point in Revit?

If you later want to return the project base point to its startup location, do the following:

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

IT IS INTERESTING:  Question: Where is File tab in AutoCAD?

What is a project point?

ProjectPoint is a Syneos Health web site, built on Microsoft’s SharePoint technology, used for the sharing of ideas, files, information, and knowledge between Syneos Health and external users. External users include sponsors, investigators, clients, customers and/or vendors.

How do you hide a project base point in Revit?

To temporarily display the project base point and the survey point in a view, on the View Control Bar click (Reveal Hidden Elements).

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.

dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

How do you unlock visibility graphics in Revit?

The Visibility/Graphics window will be greyed out (as shown above) if its included in the View Properties of the View Template. So make sure you go into the View Template and update the Visibility/Graphics or change settings to not included Visibility/Graphics.

Can you move project base point Revit?

Move the project base point to the internal origin

To establish the project coordinate system, you move the project base point away from the internal origin to another location, such as the corner of a building. … Right-click the project base point, and click Move to Startup Location.

How do I move an entire project in Revit?

Relocate a Project

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). You use the tool just like the Move tool.
  2. Move the project graphically in the view.. Note: If you have set levels or spot elevations to report values from the shared origin, their values update.
IT IS INTERESTING:  How do I save an object as a block in AutoCAD?

What is the method to georeference a Revit file?

Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.

Special Project