How do you set a project base point and survey point in Revit?

How do you set up a project base point and survey point in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

What is the project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. Initially, in stock templates, it identifies the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site.

Where is the project base point in Revit?

To see the base point in your revit model, open a site plan and then the visibility graphics window. Expand the Site Category, then make sure the Project Base Point is set to visible. Next select the project base point in the Revit View, and click on the paperclip icon.

IT IS INTERESTING:  How can I draw a floor plan for free?

How do you set the base point of a project?

To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. If it says Site: Survey Point, press Tab until it says Site: Project Base Point. Click to select the project base point. Drag the project base point to the desired location.

What is survey point and project base point?

Project Base Points and Survey Points. Every project has a project base point and a survey point , although they might not be visible in all views, because of visibility settings and view clippings. They cannot be deleted. The project base point defines the origin (0,0,0) of the project coordinate system.

How do you change survey points in Revit?

Move the Survey Point

  1. In the site plan view or another view that displays the survey point, select the survey point.
  2. Click the clip to change its state to clipped or unclipped, depending on how you want to move the survey point. …
  3. Drag the survey point to the desired location.

How do I create a project in Revit?

Create a project in Revit and enter project-specific information.

  1. Create the project. Use a project template provided by your CAD/BIM manager, or use a default template.
  2. Specify project information. Enter the client name, project name, number, and address.
  3. Define positioning. …
  4. Create construction phases.

How do you set the elevation of a project in Revit?

Manage tab> Project Location> Coordinates> Specify Coordinates at Point:

  1. Select the ground level line and specify elevation:
  2. Ground level still says 0. Select the ground level line and change the type to Shared Datum:
  3. Ground level now shows the Shared Datum levels:
IT IS INTERESTING:  How do I change the zoom speed in rhino?

How do I create a site plan in Revit 2021?

Create the Site Plan

  1. Define site settings. …
  2. Create the toposurface. …
  3. Rotate the project to True North. …
  4. Specify property lines. …
  5. Add a building pad. …
  6. Grade the toposurface. …
  7. Create parking lots, roads, and sidewalks. …
  8. Add site components.

How do you rotate a project base point in Revit?

Click Manage tab Project Location panel Position drop-down (Rotate True North). Specify the direction of True North using one of the following methods: On the Options Bar, for Angle from Project to True North, enter a value to set the angle of rotation.

How do I turn off survey points in Revit?

Look under the Site Category in VGO. Untick Project Base Point and Survey Point.

How do you change origin in Revit?

To establish the project coordinate system, move the project base point away from the internal origin to another location, such as the corner of a building. If you later want to return the project base point to the internal origin, unclip the project base point, right-click it, and click Move to Startup Location.