How do you add materials to a Bill of Materials in Solidworks?

How do you add materials to a BOM table in SolidWorks?

To insert a bill of materials:

  1. With a drawing view selected, click Insert > Tables > Excel Based Bill of Materials.
  2. In the dialog box, select an Excel template for the BOM and click Open. …
  3. In the Bill of Materials Properties dialog box, select properties from the Configuration, Contents, and Control tabs.
  4. Click OK.

How do I edit a bill of materials in SolidWorks?

Bill of Materials – Edit Text

  1. Double-click the BOM, or right-click the BOM and select Edit. While the bill of materials is active, it is displayed with row and column headers. …
  2. Edit the worksheet as needed, using Excel functions. You can perform these kinds of edits: …
  3. Click outside the worksheet to return to the drawing.

How do I unlock bill of materials in SolidWorks?

To open the Bill of Materials PropertyManager for displayed BOMs:

  1. Click the upper left corner of the BOM.
  2. If the BOM is not open, with an assembly or drawing open, select Insert > Tables > Bill of Materials.
IT IS INTERESTING:  How do I use slab edge in Revit?

How do you create a custom BOM in SolidWorks?

Click on the annotation tab on the toolbar located near the top of the screen. Once on that tab, select the drop-down menu for the table’s command and there will be a Bill of Materials option.

How do you add materials to a SolidWorks drawing?

To apply a material:

  1. Display the shortcut menu for materials: Part. In a part document, right-click Material in the FeatureManager design tree. Multibody part. …
  2. Select a material: Select from the favorites list. Click Edit Material, select a material in the material tree, and click Apply, then Close.

How do you add a description to a part in SolidWorks?

To change a feature description in a part or assembly document:

  1. Right-click the feature in the FeatureManager design tree and select Feature Properties.
  2. In the dialog box, edit the text in Description, then click OK.

How do I add a column to a bill of materials in SolidWorks?

To add custom columns to the bill of materials:

  1. Open the BOM template file. …
  2. Insert a new column where you want the information to appear. …
  3. Enter the column heading for the property you want to display in that column, and press Enter. …
  4. Click the cell to select it.

How do I add materials in Solidworks assembly?

To apply a material:

  1. Display the shortcut menu for materials: Part. In a part document, right-click Material in the FeatureManager design tree. Multibody part. …
  2. Select a material: Select from the favorites list. Click Edit Material, select a material in the material tree, and click Apply, then Close.

How do you make a Bill of Materials?

To create an accurate, detailed and effective BOM, you will need to include the following elements:

  1. BOM level: Assign each part or assembly a number to detail where it fits in the hierarchy of the BOM. …
  2. Part number: …
  3. Part name: …
  4. Description: …
  5. Phase: …
  6. Procurement type: …
  7. Quantity: …
  8. Unit of measure:
IT IS INTERESTING:  Your question: Can AutoCAD work without graphics card?

BOM Options



Select a BOM from the list. Select Linked to link the data in the drawing BOM to the assembly BOM. You can unlink the BOMs but you cannot re-link them. Changes made in either BOM are reflected in the other.

How do you add a weight in Solidworks?

To add mass properties:

  1. Enter a Property Name for the mass property.
  2. Select Text from the Type list.
  3. Under Value / Text Expression, select the appropriate mass property from the list. Mass properties use the following, system-generated format: …
  4. Press Tab or Enter. The value of the property appears under Evaluated Value.

What is Bill of Material with example?

An example of a Bill of materials is a bakery that needs to sell about 1,000 cakes. A BOM for this bakery will include all the ingredients needed to bake cakes, the baking pans, ovens, and packaging. The quantity, overall cost, and needed time should be also included in the list.