How do I move a row in a Revit schedule?

How do I edit a schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

How do I move a column in Revit schedule?

You can move the column by selecting the column and dragging it to the new location.

How do I resize a schedule row in Revit?

Right click on the column letter of the newly created column and select Edit Font. (If you right click in the row instead of the column header the Edit Font option will be grayed out.) Set the desired size of the font. Click OK.

Why can’t I edit schedule in Revit?

issue: Some schedule fields in Revit are not editable. Cause: In some instances, schedules created in Revit and viewed in Revit will not be editable. Schedules will be shown correctly, but the column containing the column containing the combined parameter will not be able to be edited.

IT IS INTERESTING:  Is architecture a feature of culture?

How do I insert a row in a Revit schedule?

select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule. Enter values as desired.



Modify a Schedule

  1. To edit a cell, click in it. …
  2. To select a column, click a column index (the alphabetical cells between the title and header).

How do you rotate a schedule in Revit?

Rotate a Revision Schedule

  1. Open the title block for editing.
  2. In the drawing area, select the revision schedule of the title block. …
  3. On the Options Bar, for Rotation on Sheet, select the desired rotation option.
  4. Reposition the rotated revision schedule on the title block, if needed.

How do I change a schedule category in Revit?

You can modify a default schedule, or create new schedules based on existing default schedules. In the Building/Space Type Settings dialog, click the value field for a schedule (Occupancy, Lighting, and Power Schedule), and click . In the left panel of the Schedule Settings dialog, select a default schedule.

Can you hide rows in Revit schedule?

You’ll need to use filters (View Properties > Filters) to hide rows.

How do you make a schedule smaller in Revit?

Click on the schedule in the sheet view and the Resize button will appear on the Modify Schedule Graphics Tab.

What control do you select to change a schedule column width?

To adjust the column width, select the schedule. A blue triangle displays to the upper right of each column. Drag a blue triangle to the left or right. Note: If the schedule is split into multiple sections, adjusting the width in one section changes the width in all sections.

IT IS INTERESTING:  Best answer: Can AutoCAD Open XML files?

How do you change the size of a column in Revit?

Modify type properties to define column dimensions, materials, fill patterns, and more. To change type properties, select an element and click Modify tab Properties panel (Type Properties). Changes to type properties apply to all instances in the project.

How do I open a schedule in Revit?

In the Project Browser, expand the Schedules/Quantities branch. As you can see, this project already contains a number of schedules. Double-click the Door Schedule to open that view. The schedule displays information about the doors in this project.

How do you unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.