How do I limit a workset in Revit?

How do you control a workset in Revit?

To control the worksets in the linked project, select the linked file and then click Manage Worksets. Revit displays the Manage Worksets for Link dialog. Here, you can select one or more linked worksets and change their Opened status.

How do you isolate a workset in Revit?

When working on a workshared project, you can override the global setting to hide or show each workset in a view.

  1. Open the view.
  2. Click View tab Graphics panel (Visibility/Graphics).
  3. On the Worksets tab of the Visibility/Graphics dialog, for each workset, select one of the following values: Value. Result. …
  4. Click OK.

How do you change the workset of an element in Revit?

Reassign an Element to a Different Workset

  1. In the drawing area, select an element.
  2. On the Properties palette, locate the Workset parameter under Identity Data.
  3. Click in the Value column for the parameter, and select a new workset.

How do you make a Workset not editable in Revit?

Note: You can only change the editable status of worksets that are not owned by another user.

  1. Click Collaborate tab Manage Collaboration panel (Worksets).
  2. In the Worksets dialog, click the Editable value next to the workset name, and select Yes or No. …
  3. Click OK to close the Worksets dialog.
IT IS INTERESTING:  How do I turn off read only in Solidworks?

What is Revit workset?

A workset is a collection of elements in a workshared project. You can create worksets based on functional areas, such as the following: For architecture and structural engineering: interior, exterior, and site. For systems: HVAC, electrical, or plumbing.

How do I create a workset in Revit?

Create Worksets

  1. Open your local copy of the central model.
  2. Click Collaborate tab Manage Collaboration panel (Worksets).
  3. In the Worksets dialog, click New.
  4. In the New Workset dialog, enter a name for the new workset.
  5. To display the workset in all project views, select Visible in all views. …
  6. Click OK.

How do I temporarily isolate in Revit?

In the drawing area, select one or more elements. On the View Control Bar, click (Temporary Hide/Isolate) and then select one of the following: Isolate Category. For example, if you select some walls and doors, only walls and doors will remain visible in the view.

How do you stop isolation in Revit?

To exit temporary hide/isolate mode without saving changes: On the View Control Bar, click , and then click Reset Temporary Hide/Isolate. All temporarily hidden elements are restored to the view.

How do I edit a workset?

Edit a Workset

  1. Select an active workset, using one of the following methods: …
  2. If you want all elements that are not in the active workset to be gray, click Collaborate tab Manage Collaboration panel (Gray Inactive Worksets).
  3. Edit or add elements in the workset, as necessary.

How do I change a workset in a group in Revit?

In the drawing area, select an element. On the Properties palette, locate the Workset parameter under Identity Data. Click in the Value column for the parameter, and select a new workset. In the Properties palette, the Workset parameter can be edited without first borrowing the element.

IT IS INTERESTING:  How do I make revision clouds red in Revit?

How do I change a workset within a group in Revit?

To edit the group, make the group type workset editable or borrow the group type. To modify the elements inside a group, make the group instance workset editable. To determine which worksets the elements are in, select elements and check the Workset property on the Properties palette.

What does workset not editable mean?

Editable and Non-editable refer to worksets or elements. Editable means that you have them and no one else can edit them. Non-editable means no one has them and anyone can edit them.

How do I change a workset name?

Rename a Workset

  1. Click Collaborate tab Manage Collaboration panel (Worksets).
  2. In the Worksets dialog, select the name of the workset and click Rename.
  3. In the Rename dialog, enter a new name.
  4. Click OK twice.
Special Project