Your question: What is the origin in Revit?

How do you find the origin in Revit?

On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point. To display the internal origin, select Internal Origin.

How do I revert back to origin in Revit?

To find the true Origin Point in a Revit model, simply Unclip the Project Base Point, then right-click and select “Move to Startup Location.” By doing this, IF the Project Base Point was unclipped and moved away from the Origin Point to start with, then the Project Base Point will move back to the true Origin Point.

What is the project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. Initially, in stock templates, it identifies the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site.

IT IS INTERESTING:  How do I enable motion add ins in SOLIDWORKS?

How do I turn off origin in Revit?

To hide internal origin in the views, use one of the following options

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. Click Browse to folder and select the local folder with the Dynamo script.
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

What are the 3 points in Revit?

There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.

What is survey point?

It represents a known point in the physical world, such as a geodetic survey marker or the intersection of 2 property lines. The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application.

How do I create a site plan in Revit 2021?

Create the Site Plan

  1. Define site settings. …
  2. Create the toposurface. …
  3. Rotate the project to True North. …
  4. Specify property lines. …
  5. Add a building pad. …
  6. Grade the toposurface. …
  7. Create parking lots, roads, and sidewalks. …
  8. Add site components.

How do you show survey points in Revit?

To see the base point in your revit model, open a site plan and then the visibility graphics window. Expand the Site Category, then make sure the Project Base Point is set to visible. Next select the project base point in the Revit View, and click on the paperclip icon.

How do you align a project base point in Revit?

Auto – Project Base Point to Project Base Point



If the host model’s project base point changes, the linked model does not reflect the change. To reposition the linked model, select it, right-click, and click Reposition to Project Base Point.

IT IS INTERESTING:  How do I open a OBJ file in Revit?

How do I move an entire model in Revit?

Relocate the Model

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). The Relocate Project tool works similar to the Move tool. As you move the cursor over elements, valid references are highlighted and identified in the status bar.
  2. Move the project graphically in the view.

What is the difference between “link CAD files” and “import CAD files” in Revit? Linked files retain the reference to the external files and will update when the Revit model is reopened or the linked file is reloaded. Imported files become a part of the Revit model and lose any connection to the source.

How do you rotate True North in Revit?

Click Manage tab Project Location panel Position drop-down (Rotate True North).



Rotate True North

  1. Select the rotation control that displays at the center of the model, and drag it to the guide.
  2. Click along the guide to indicate the direction of True North.
  3. Click again toward the top of the application window.

What are shared Coordinates in Revit?

When you combine multiple models and files in a single project, use shared coordinates to establish the positions of the files in relation to each other. A Revit project has internal coordinates for all the elements that compose the model in a project. Those coordinates are known to this project only.

Special Project