How do you split a sheet in Revit?

How do you split a sheet index in Revit?

These versions of Revit do not have a feature to split a schedule between multiple sheets.

Follow these steps:

  1. Place the schedule onto the first sheet.
  2. Select the schedule from the sheet.
  3. Adjust it using the split icon on the side and the drag points at the column ends.

How do I split a schedule in multiple worksheets in Revit?

Split a Schedule Across Multiple Sheets

  1. Do one of the following: …
  2. Select the sheets where the schedule segments will be placed. …
  3. Select the height for schedule segments on each sheet. …
  4. Click Split & Place.
  5. The first selected sheet is opened, click to place the schedule segment.

How do I split a view in Revit?

Divide a View Across Multiple Sheets

  1. In a project, create and prepare the view that you want to divide into parts. …
  2. Create dependent views. …
  3. Create the sheets on which to place the dependent views.
  4. Add the dependent views to their respective sheets.
  5. (Optional) Add view references to the primary view.

How do you unsplit a table in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

IT IS INTERESTING:  Best answer: How do you write access in Solidworks?

How do I merge split schedules in Revit?

Merge Split Schedules on Sheets

  1. On a sheet that displays a split schedule, select the schedule. Use the 4-way arrow control to drag one schedule segment over the other segment.
  2. Release the mouse button. The split schedule segments merge.

How do you scale a schedule in Revit?

To adjust the Scale Format in View Schedules:

  1. Select the View Schedule in Revit.
  2. Click on Edit fields.
  3. Click on “Add calculated parameter” in the dialog.
  4. Create a name for the parameter.

How do I make a Revit schedule smaller?

Click on the schedule in the sheet view and the Resize button will appear on the Modify Schedule Graphics Tab.

How do you split elevation in Revit?

To do this, select the elevation line, in the Ribbon select the Split Segments tool and pick the elevation line where you would like to split the line, then move the split segment to the desired location.

How do I split a column in Revit schedule?

You can split the Graphical Column Schedule by defining a maximum number of columns to display per segment. On the Properties palette, under the Graphics section, enter the number of columns for each segment. The schedule breaks into a new segment when that number of columns is met.

How do you split a schedule in Revit 2021?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again. …
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.
IT IS INTERESTING:  How do I get recenter view in blender?

How do I merge columns in Revit schedule?

select cells in one or more rows and click (Delete Row). select header cells to be merged and click (Merge). Select merged cells and click (Merge) again to separate merged cells.