How do you link objects in Revit?

Open an existing model, and link another model to it.

  1. Open an existing model or start a new model. You will link another model into this model.
  2. Click Insert tab Link panel (Link Revit).
  3. In the Import/Link RVT dialog, select the model to link. …
  4. For Positioning, specify the desired option. …
  5. Click Open.

In the drawing area, select the linked Revit model. Click Modify | RVT Links tab Link panel (Bind Link). In the Bind Link Options dialog, select the elements and datum to include in the group, and click OK.

How do I enable a linked model in Revit?

In the RVT Link Display Settings dialog, on the Basics tab, do the following:

  1. Select By linked view.
  2. For Linked view, select the view in the linked model whose display settings you want to use for the linked model in the current host view.

When you link a model that contains other linked models, the links become nested. You can show or hide nested linked models in the host model.

IT IS INTERESTING:  How do you show grid lines in elevation in Revit?

To access tools for link management, click Manage tab Manage Project panel (Manage Links). To update linked models without closing the current project, you can reload the linked models. Unload linked models to temporarily remove them from the project.

Binding Revit link makes elements from the link to change position in Revit.

May 07 2020In-product view. Use the Bind Link tool to select the elements and datum from a linked model to convert to a group.

How do you explode a linked file in Revit?

Click Modify | tab Import Instance panel Explode drop-down Partial Explode or Full Explode.

What is the difference between overlay and attachment in Revit link?

Overlay does not load nested models into the host model, so they do not display in the project. Attachment loads nested linked models in the host model and displays them in the project.

Special Project